Prime Data Centers PHX01-01

Under construction

3700 S. Avondale Boulevard, Avondale, AZ

Prime Data Centers PHX01-01 is a data center in Avondale, AZ, United States, operated by Prime Data Centers, with 48 MW of published IT capacity, currently under construction.

Prime Data Centers' PHX01-01, the first of five 48 MW hyperscale buildings on the operator's 240 MW Avondale campus southwest of Phoenix, under construction with capacity already leased to a hyperscale customer.

Prime Data Centers PHX01-01 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Prime Data Centers
City
Avondale, AZ, United States
Power, MW
48 MW
Cooling
Liquid
Floor space
24,805 m²
AI-ready
Yes
SOC 2 Type II
D

Coloprice Score

39 out of 100

Class D · #146 of 574 in United States

  • Resilience6/35
  • Compliance6/20
  • Transparency9/20
  • Scale15/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Prime Data Centers PHX01-01 — Coloprice Score 39
<a href="https://coloprice.com/data-centers/usa/avondale/prime-phx01-01-avondale/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/prime-phx01-01-avondale.svg"
    alt="Prime Data Centers PHX01-01 — Coloprice Score 39" height="64">
</a>

PHX01-01 is the first of five planned hyperscale buildings on Prime Data Centers' PHX01 campus along S. Avondale Boulevard in Avondale, part of the greater Phoenix metro. At full build the 66.5-acre, 1.3 million sq ft site will house five 48 MW buildings for a combined 240 MW of critical IT capacity across 20 data halls, with an on-site 250 MW substation whose first phase has already been energized. PHX01-01 through PHX01-03 broke ground in May 2026 and have leased capacity, positioning the campus as one of the largest hyperscale AI-focused developments in the Southwest. The building uses closed-loop air and liquid cooling for AI workloads and targets SOC 2 Type II compliance with ISO 27001 certification in progress; no Tier rating is published. Prime, headquartered in Dallas, markets the campus with a committed path to 100% renewable power.

  • 48 MW critical, part of a five-building 240 MW campus
  • Groundbreaking May 2026; capacity already leased to a hyperscaler
  • 20 data halls across the campus, on-site 250 MW substation (phase 1 commissioned)
  • Closed-loop air/liquid cooling, AI-ready
  • SOC 2 Type II; ISO 27001 in progress

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Avondale, AZ

Source — Verified against operator sources · data pending on-site verification