Crusoe AI Campus (Blue Energy, Calhoun County)

Announced

Crusoe AI Campus (Blue Energy, Calhoun County) is a data center in Calhoun County, TX, United States, operated by Crusoe, announced, not yet built.

An early-stage, 1,600-acre AI campus near the Port of Victoria in Calhoun County, Texas, where Crusoe has partnered with nuclear developer Blue Energy for a gas-to-nuclear power plant of up to 1.5 GW to supply the site.

Crusoe AI Campus (Blue Energy, Calhoun County) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · planned
Operator
Crusoe
City
Calhoun County, TX, United States
Power, MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

4 out of 100

limited data · #785 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency0/20
  • Scale4/15
  • Maturity0/10
How the score is calculated →
Embed score badge
Crusoe AI Campus (Blue Energy, Calhoun County) — Coloprice Score 4
<a href="https://coloprice.com/data-centers/usa/calhoun-county/crusoe-blue-energy-calhoun-county-tx/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/crusoe-blue-energy-calhoun-county-tx.svg"
    alt="Crusoe AI Campus (Blue Energy, Calhoun County) — Coloprice Score 4" height="64">
</a>

This is an early-stage AI campus Crusoe plans to build on a 1,600-acre site near the Port of Victoria in Calhoun County, Texas, paired with a dedicated power plant from nuclear developer Blue Energy. Blue Energy's plan is to build "up to 1.5 gigawatts" of generation using a gas-to-nuclear approach: natural-gas turbines would power the campus first, with power delivery targeted as early as 2028, before the site transitions to nuclear generation by around 2031 using Blue Energy's modular, shipyard-manufactured reactor design. No tenant, building count or data-center-specific power figure has been published for the Crusoe campus itself — the 1.5 GW figure describes the power plant's planned generation capacity rather than a confirmed IT load, so it is not used as the facility's power rating here. The partnership is presented as the same model Crusoe has used with land/power partners at its other Texas sites, with Crusoe responsible for designing, building and operating the data center.

  • 1,600-acre site near the Port of Victoria, Calhoun County, TX
  • Blue Energy to build a gas-to-nuclear power plant of "up to 1.5 GW" for the campus
  • Natural-gas bridge power targeted as early as 2028; nuclear transition targeted ~2031
  • No tenant or data-center MW figure published yet — very early stage

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification