▮▮Coloprice

LightEdge Minneapolis I

Operational

LightEdge Minneapolis I is a data center (Uptime Tier III, design certified) in Chaska, MN, United States, operated by LightEdge, with 3.6 MW of published IT capacity, currently operational, opened in 2013.

A Twin Cities-market data center in Chaska, Minnesota, originally built by Stream Data Centers in 2013 and acquired by LightEdge in January 2024, holding an Uptime Institute Tier III Design Certification and rated for high-density AI racks above 50 kW.

LightEdge Minneapolis I — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

10 of 14 fields published · Operator? Add or correct data →

Units
Operator
LightEdge
City
Chaska, MN, United States
Power, MW
3.6 MW
Cooling
Air
Uptime Tier
III · design certified
Opened
2013
Floor space
7,062 m²
AI-ready
Yes
Market benchmark
$196 per kW per month wholesale · United States
Index rate for the market, not this operator’s price list
Address
1708 West Creek Lane, Chaska, MN 55318 · Open in maps ↗
Uptime Tier III Design

2 sources · data pending on-site verification

D

Coloprice Score

46 out of 100

Class D · #42 of 1344 in United States

  • Resilience16/35
  • Compliance0/20
  • Transparency11/20
  • Scale10/15
  • Maturity9/10
How the score is calculated →
Embed score badge
LightEdge Minneapolis I — Coloprice Score 46
<a href="https://coloprice.com/data-centers/usa/chaska/lightedge-minneapolis-chaska/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/lightedge-minneapolis-chaska.svg"
    alt="LightEdge Minneapolis I — Coloprice Score 46" height="64">
</a>

Connectivity: 1 networks and 0 internet exchanges are present in this facility.

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

LightEdge Minneapolis I — Best data center in Chaska, MN, United States 2026
#1 of 3 · See the list →

LightEdge Minneapolis I is a data center at 1708 West Creek Lane in Chaska, Minnesota, in the Twin Cities market. It was built by Stream Data Centers and opened in 2013, and LightEdge acquired it in January 2024. The operator publishes 3.6 MW of capacity and about 7,060 m² of floor space, and holds an Uptime Institute Tier III Design Certification. LightEdge states the building is rated for high-density racks above 50 kW, which is why the catalog flags it as AI-ready; no cooling method is named on the pages reviewed, so that field is left empty. The facility page presents it as a secure, high-density colocation site supporting hybrid cloud and business-continuity services and lists enterprise customers such as Costco, 3M and Caterpillar. Rack count, carrier list, renewable share and detailed redundancy are not published.

  • ▮Published capacity is 3.6 MW.
  • ▮Uptime Institute Tier III Design Certification is held (design, not constructed).
  • ▮Racks above 50 kW are stated as supported.
  • ▮Built by Stream Data Centers in 2013; acquired by LightEdge in January 2024.

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Compare with nearby facilities

FacilityOperatorPower, MWTierStatuskm
LightEdge Minneapolis ILightEdge3.6IIIOperational0
Flexential Minneapolis - ChaskaFlexential9—Operational6
US Signal MN01US Signal5.4IIIOperational20
EdgeConneX EDCMSP01EdgeConneX——Operational20
NP Belle Plaine (MSP1)Neutral Path Communications——Operational23
Ridgeview MinnetonkaRidgeview——Operational24

Source — Verified against operator sources · data pending on-site verification