Ada Infrastructure VA1

Under construction

Ada Infrastructure VA1 is a data center in Virginia (I-95 South corridor), United States, operated by Ada Infrastructure, with 400 MW of published IT capacity, currently under construction.

314-acre, 400 MW master-planned campus in Virginia's emerging I-95 South data center corridor, developed by Ada Infrastructure with first power delivery targeted for 2028.

Ada Infrastructure VA1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
Ada Infrastructure
City
Virginia (I-95 South corridor), United States
Power, MW
400 MW
Cooling
Air
AI-ready
Yes

Coloprice Score

20 out of 100

limited data · #587 of 837 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Ada Infrastructure VA1 — Coloprice Score 20
<a href="https://coloprice.com/data-centers/usa/chesterfield-county-va/ada-infrastructure-va1-chesterfield-county/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ada-infrastructure-va1-chesterfield-county.svg"
    alt="Ada Infrastructure VA1 — Coloprice Score 20" height="64">
</a>

VA1 is Ada Infrastructure's first announced North American campus, a 314-acre master-planned site in Virginia's emerging I-95 South data center corridor, south of the long-established Northern Virginia (Ashburn/Loudoun) cluster. The company plans to build the site out in two phases to a total of 400 MW of IT load: Phase 1 covers two buildings for 200 MW, with a second, currently unscheduled 200 MW phase to follow. Ada has secured a 300 MVA power position for the campus and targets first power delivery in 2028. The design is built to support either liquid cooling or traditional air-cooled environments depending on tenant requirements, positioning the site for high-density AI hardware as well as conventional enterprise and hyperscale workloads. Buildings are designed for concurrent maintainability, an annualized design PUE of 1.3, up to three points of entry per building and up to four diverse property entrance vaults for carrier-neutral connectivity, with a target of LEED BD+C Data Center Gold certification. Ada Infrastructure is backed by Ares Management.

  • 314-acre master-planned campus targeting 400 MW of IT load in two phases
  • Phase 1: two buildings for 200 MW; Phase 2: further 200 MW, timing TBD
  • 300 MVA secured power position; first power delivery targeted for 2028
  • Designed for either liquid or traditional air cooling depending on tenant needs
  • Designed PUE 1.3 (annualized); targeting LEED BD+C Data Center Gold

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Virginia (I-95 South corridor)

Source — Verified against operator sources · data pending on-site verification