Lunavi Cheyenne Data Center
OperationalLunavi Cheyenne Data Center is a data center in Cheyenne, United States, operated by Lunavi, with 5 MW of published IT capacity, currently operational.
Lunavi (formerly Green House Data) operates its flagship Cheyenne, Wyoming data center with 5 MW of concurrently-maintainable power, expandable to 8 MW.

- Operator
- Lunavi
- City
- Cheyenne, United States
- Power, MW
- 5 MW
- Cooling
- Air
- Market benchmark
- $196 per kW per month wholesale · United States
- Index rate for the market, not this operator’s price list
- Address
- 340 Progress Circle, Cheyenne, WY 82007
1 sources · data pending on-site verification
Coloprice Score
38 out of 100
Class D · #219 of 1349 in United States
- Resilience6/35
- Compliance11/20
- Transparency6/20
- Scale8/15
- Maturity7/10
Connectivity: 4 networks and 0 internet exchanges are present in this facility.
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Lunavi's Cheyenne, Wyoming facility at 340 Progress Circle is the flagship site of a company that started as Green House Data before rebranding to Lunavi in 2020; the building itself changed hands in 2025 when a Harrison Street/1547 Critical Systems Realty joint venture acquired it from CIM Group, with Lunavi continuing on as operating tenant and brand. The site runs at 4 MW of critical IT load against 5 MW of concurrently-maintainable capacity, with room to expand to 8 MW, and uses custom Vertiv indirect-evaporative cooling units tuned to draw on Wyoming's dry climate for outside-air economization, reporting an average PUE of 1.17 and a best-case figure of 1.05. Lunavi holds HIPAA/HITECH, SOC 1 Type II, SOC 2 Type II and PCI SAQ D attestations, aimed at enterprise and regulated-industry colocation tenants. Cheyenne's low humidity, inexpensive power and central US location have made it a recurring site choice for data center operators seeking free-cooling economics outside the major coastal markets; Lunavi also operates a smaller site in Bellingham, Washington, not covered by this entry. No independent tier certification or exact opening year is published on the operator's own site.
- ▮5 MW concurrently-maintainable power (4 MW critical IT load), expandable to 8 MW
- ▮Vertiv indirect-evaporative cooling exploiting Wyoming's dry climate — 1.17 average PUE
- ▮HIPAA/HITECH, SOC 1 Type II, SOC 2 Type II, PCI SAQ D
- ▮Building acquired by a Harrison Street/1547 Critical Systems Realty JV in 2025; Lunavi remains operating tenant
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Compare with nearby facilities
| Facility | Operator | Power, MW | Tier | Status | km |
|---|---|---|---|---|---|
| Lunavi Cheyenne Data Center | Lunavi | 5 | — | Operational | 0 |
| Mountain West Technologies - Cheyenne | Mountain West Technologies | — | — | Operational | 9 |
| ACT Cheyenne | Advanced Communications Technology | — | — | Operational | 13 |
Source — Verified against operator sources · data pending on-site verification
- Lunavi — Cheyenne Data Center