DC BLOX Atlanta East

Under construction

1726 Farmer Road, Conyers, GA 30012

DC BLOX Atlanta East is a data center in Conyers, United States, operated by DC BLOX, with 154 MW of published IT capacity, currently under construction.

DC BLOX's Atlanta East hyperscale campus in Conyers, Rockdale County, a four-building, 154 MW development roughly 24 miles east of downtown Atlanta that broke ground in 2024 and remains under construction.

DC BLOX Atlanta East — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
DC BLOX
City
Conyers, United States
Power, MW
154 MW
Cooling
Air
Floor space
69,476 m²
AI-ready
Yes
E

Coloprice Score

25 out of 100

Class E · #342 of 574 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity3/10
How the score is calculated →
Embed score badge
DC BLOX Atlanta East — Coloprice Score 25
<a href="https://coloprice.com/data-centers/usa/conyers/dcblox-atlanta-east-conyers/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/dcblox-atlanta-east-conyers.svg"
    alt="DC BLOX Atlanta East — Coloprice Score 25" height="64">
</a>

Atlanta East is DC BLOX's hyperscale campus on Farmer Road in Conyers, Rockdale County, about 24 miles east of downtown Atlanta. At full build the site will hold four buildings — one 10 MW and three 48 MW — totaling 154 MW of committed and planned critical power across 747,787 sq ft. Construction, which broke ground in 2024, is engineered for 135 mph winds with 15-foot ceiling heights and a targeted annualized design PUE of 1.3 at full load. DC BLOX designs the campus to a Tier III basis of design with optional Uptime Institute certification, and to support SOC 2 Type II, NIST 800-171 and HIPAA/HITRUST compliance once operational. Connectivity plans include at least three diverse points of entry and dark fiber routes to Atlanta's internet exchanges and onward to DC BLOX's Myrtle Beach cable landing station. No specific completion date for the first building is published.

  • 154 MW committed/planned across 4 buildings (1×10 MW, 3×48 MW), 747,787 sq ft
  • Broke ground 2024; construction ongoing as of latest disclosure
  • 135 mph wind rating, target PUE 1.3 at full load
  • Tier III basis of design; SOC 2/NIST 800-171/HIPAA-HITRUST targeted
  • Dark fiber route planned to Atlanta IXs and DC BLOX's Myrtle Beach cable landing station

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification