Core Scientific Denton (CoreWeave)

Operational

Core Scientific Denton (CoreWeave) is a data center in Denton, TX, United States, operated by Core Scientific, with 260 MW of published IT capacity, currently operational.

Core Scientific's Denton, Texas site, expanded under a $1.2 billion deal with CoreWeave to approximately 260 MW of contracted critical IT load for GPU hosting.

Core Scientific Denton (CoreWeave) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation
Operator
Core Scientific
City
Denton, TX, United States
Power, MW
260 MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

26 out of 100

limited data · #380 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Core Scientific Denton (CoreWeave) — Coloprice Score 26
<a href="https://coloprice.com/data-centers/usa/denton/core-scientific-denton-tx/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/core-scientific-denton-tx.svg"
    alt="Core Scientific Denton (CoreWeave) — Coloprice Score 26" height="64">
</a>

Core Scientific's Denton, Texas facility is one of the sites the former Bitcoin-mining operator has converted for GPU hosting under contract to CoreWeave. In February 2025 the companies announced a $1.2 billion expansion that added 70 MW of additional contracted power at Denton, bringing the site's total contracted critical IT load to approximately 260 MW. The expansion was part of a broader set of agreements between the two companies that, at the time, brought CoreWeave's total contracted revenue with Core Scientific past $10 billion across six Core Scientific sites. Core Scientific owns and operates the physical facility; CoreWeave is the named GPU-hosting customer rather than the site operator. A subsequent attempt by CoreWeave to acquire Core Scientific outright was announced and then terminated in October 2025, leaving Core Scientific as an independent, third-party host for CoreWeave's contracted capacity at Denton.

  • ~260 MW total contracted critical IT load for CoreWeave GPU hosting
  • $1.2 billion expansion announced February 2025 added 70 MW
  • One of six Core Scientific sites hosting CoreWeave capacity
  • CoreWeave's 2025 bid to acquire Core Scientific was terminated; Denton remains a lease/hosting site

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract