Applied Digital Polaris Forge 1 (Ellendale)

Operational

Applied Digital Polaris Forge 1 (Ellendale) is a data center in Ellendale, ND, United States, operated by Applied Digital, with 400 MW of published IT capacity, currently operational.

Applied Digital's Polaris Forge 1 campus in Ellendale, North Dakota, leased entirely to CoreWeave under 15-year agreements totaling 400 MW of critical IT load, with the campus designed to scale toward 1 GW.

Applied Digital Polaris Forge 1 (Ellendale) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation

5 of 14 fields published · Operator? Add or correct data →

Units
City
Ellendale, ND, United States
Power, MW
400 MW
Cooling
Liquid
AI-ready
Yes
Market benchmark
$196 per kW per month wholesale · United States
Index rate for the market, not this operator’s price list

4 sources · last checked 2026-10-06 · data pending on-site verification

—

Coloprice Score

26 out of 100

limited data · #502 of 1344 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale15/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Applied Digital Polaris Forge 1 (Ellendale) — Coloprice Score 26
<a href="https://coloprice.com/data-centers/usa/ellendale/applied-digital-polaris-forge-1-ellendale/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/applied-digital-polaris-forge-1-ellendale.svg"
    alt="Applied Digital Polaris Forge 1 (Ellendale) — Coloprice Score 26" height="64">
</a>

Polaris Forge 1 is Applied Digital's flagship AI data center campus in Ellendale, North Dakota, built by the company and leased in full to CoreWeave under a series of 15-year agreements: an initial 250 MW lease signed in mid-2025, followed by an additional 150 MW lease shortly after, for a combined 400 MW of contracted critical IT load. Applied Digital designed the campus to scale to 1 GW of total capacity over time. The first 50 MW phase reached "Ready for Service" status in October 2025, with later tranches phased in afterward. On 2 October 2026 the company announced that the second phase of Building 2 reached Ready for Service, adding 75 MW across three 25 MW data halls and bringing fully operational critical IT load to 250 MW of the contracted 400 MW. Applied Digital's own investor materials put the anticipated lease revenue across the full 400 MW at roughly $11 billion over the contract term. As with Applied Digital's other campuses, the site began as Bitcoin-mining infrastructure before being converted and expanded for GPU-hosting customers, and CoreWeave is named directly as the tenant in the company's SEC filings and press releases.

  • ▮400 MW total contracted lease to CoreWeave (250 MW + 150 MW), campus designed to scale to 1 GW
  • ▮First 50 MW phase reached "Ready for Service" October 2025
  • ▮~$11 billion in anticipated lease revenue across the full 400 MW, per Applied Digital
  • ▮15-year lease agreements; Applied Digital designs, builds and operates the campus
  • ▮250 MW of critical IT load operational as of 2 October 2026 (Building 2: 150 MW complete)

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: