NTT Ashburn VA11 Data Center

Under construction

7251 Grove Hill Blvd, Gainesville, VA 20155, USA

NTT Ashburn VA11 Data Center is a data center in Gainesville, United States, operated by NTT Global Data Centers, with 96 MW of published IT capacity, currently under construction.

NTT's second Northern Virginia campus, in Gainesville, planned at 96 MW of critical IT load — the largest single facility in NTT's disclosed North American portfolio.

NTT Ashburn VA11 Data Center — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · under construction
Operator
NTT Global Data Centers
City
Gainesville, United States
Power, MW
96 MW
Cooling
Air
Floor space
27,871 m²
E

Coloprice Score

23 out of 100

Class E · #390 of 574 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale11/15
  • Maturity3/10
How the score is calculated →
Embed score badge
NTT Ashburn VA11 Data Center — Coloprice Score 23
<a href="https://coloprice.com/data-centers/usa/gainesville/ntt-ashburn-va11-gainesville/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ntt-ashburn-va11-gainesville.svg"
    alt="NTT Ashburn VA11 Data Center — Coloprice Score 23" height="64">
</a>

NTT Ashburn VA11 is, by the operator's own naming, part of the Ashburn portfolio, but it actually sits on a separate campus in Gainesville, Virginia, roughly 20 km from the Data Center Alley cluster where NTT's VA1–VA9 buildings are concentrated. NTT describes it as its second Northern Virginia campus. At a planned 96 MW of critical IT load across more than 300,000 sq ft (roughly 27,900 sqm), it is the largest single facility in NTT's disclosed North American portfolio, well ahead of the 32–36 MW buildings on the main Ashburn campus. The design uses N+1 distributed redundancy per 8 MW power vault, with fan coil wall cooling, hot-aisle containment and closed-loop water cooling — the same cooling approach NTT is deploying across its newer US builds (VA4, VA7, Chicago CH2/CH3, Dallas TX4, Phoenix PH4). The facility is still in pre-lease construction, targeting opening in early 2027, so its capacity figures describe the plan rather than a commissioned building. No specific third-party certification is named on the public page, and no renewable-energy percentage is disclosed.

  • Largest facility in NTT's disclosed North American portfolio: 96 MW critical IT load planned
  • Second Northern Virginia campus for NTT, in Gainesville — geographically separate from the main Ashburn/Data Center Alley campus
  • 300,000+ sq ft (~27,900 sqm); N+1 distributed redundancy per 8 MW vault
  • Fan coil wall cooling, hot-aisle containment, closed-loop water cooling; targeting opening early 2027

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Gainesville

Source — Verified against operator sources · data pending on-site verification