▮▮Coloprice

SB Energy Milam County (Stargate/OpenAI)

Under construction

SB Energy Milam County (Stargate/OpenAI) is a data center in Milam County, TX, United States, operated by SB Energy (SoftBank), currently under construction.

One of five Stargate sites announced by SoftBank and OpenAI in September 2025, with SB Energy — a SoftBank Group company — providing powered infrastructure for a fast-build data center in Milam County, Texas.

SB Energy Milam County (Stargate/OpenAI) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
SB Energy (SoftBank)
City
Milam County, TX, United States
Power, MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

7 out of 100

limited data · #773 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency0/20
  • Scale4/15
  • Maturity3/10
How the score is calculated →
Embed score badge
SB Energy Milam County (Stargate/OpenAI) — Coloprice Score 7
<a href="https://coloprice.com/data-centers/usa/milam-county/sb-energy-milam-county-tx/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/sb-energy-milam-county-tx.svg"
    alt="SB Energy Milam County (Stargate/OpenAI) — Coloprice Score 7" height="64">
</a>

Milam County, Texas is one of two sites SoftBank named alongside Lordstown, Ohio in a September 2025 press release announcing an expansion of the SoftBank/OpenAI Stargate partnership. SoftBank's own statement describes SB Energy, a SoftBank Group company, as "providing powered infrastructure for a fast-build data center site" in Milam County, without disclosing a site-specific power figure — the release gives only a combined target for both new sites together ("scale to 1.5 gigawatts over the next 18 months"). No acreage, building specifications, or individual power capacity for Milam County alone has been confirmed in SoftBank's own materials, so the MW field is left unset here rather than repeating the site-specific figures that circulate only in secondary trade coverage.

  • One of five Stargate sites named by SoftBank/OpenAI in September 2025
  • SB Energy (SoftBank Group) providing powered infrastructure for a fast-build site
  • Combined with Lordstown, OH, targeted to "scale to 1.5 GW over 18 months" — no per-site MW published
  • No acreage or building details published in SoftBank's own release

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification