Microsoft Fairwater (Mount Pleasant)

Operational

Microsoft Fairwater (Mount Pleasant) is a data center in Mount Pleasant, WI, United States, operated by Microsoft, currently operational.

Microsoft's Fairwater AI datacenter in Mount Pleasant, Wisconsin — a 315-acre, 1.2 million sq ft campus across three buildings, completed in June 2026, running NVIDIA GB200 Blackwell racks on closed-loop liquid cooling with zero operational water waste.

Microsoft Fairwater (Mount Pleasant) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation
Operator
Microsoft
City
Mount Pleasant, WI, United States
Power, MW
Cooling
Liquid
Floor space
111,484 m²
AI-ready
Yes

Coloprice Score

14 out of 100

limited data · #638 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency3/20
  • Scale4/15
  • Maturity7/10
How the score is calculated →
Embed score badge
Microsoft Fairwater (Mount Pleasant) — Coloprice Score 14
<a href="https://coloprice.com/data-centers/usa/mount-pleasant-wi/microsoft-fairwater-mount-pleasant-wi/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/microsoft-fairwater-mount-pleasant-wi.svg"
    alt="Microsoft Fairwater (Mount Pleasant) — Coloprice Score 14" height="64">
</a>

Fairwater is Microsoft's flagship AI datacenter campus in Mount Pleasant, Wisconsin (Racine County), which the company completed construction on in June 2026 following a May 2024 announcement. The 315-acre site spans 1.2 million sq ft across three buildings, using NVIDIA GB200 servers with Blackwell GPUs — 72 GPUs per rack — connected through NVLink/NVSwitch at rack level and an 800 Gbps InfiniBand/Ethernet fat-tree fabric. Microsoft describes a closed-loop liquid cooling system with zero operational water waste covering more than 90% of the datacenter, built around what the company calls the second-largest water-cooled chiller plant in the world. No exact power-capacity figure has been published by Microsoft. The company estimates $4.7 billion in hyperscale construction spend in Wisconsin between 2024 and 2028 and has committed a further $4 billion to build a second, similarly sized datacenter at the same campus, targeted for completion in 2028, taking total Wisconsin investment past $7 billion. Around 550 full-time employees work on site at the first facility.

  • 315-acre campus, 1.2M sq ft across 3 buildings; first facility completed June 2026
  • NVIDIA GB200 Blackwell racks, 72 GPUs/rack, 800 Gbps InfiniBand/Ethernet fat-tree fabric
  • Closed-loop liquid cooling, zero operational water waste on 90%+ of the site
  • Second, similarly sized datacenter under construction, targeted 2028; total Wisconsin spend >$7B
  • No exact MW figure published by Microsoft

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release: