DC BLOX Myrtle Beach Cable Landing Station
Operational1401 Howard Avenue, Myrtle Beach, SC 29577
DC BLOX Myrtle Beach Cable Landing Station is a data center (Uptime Tier III, design certified) in Myrtle Beach, United States, operated by DC BLOX, with 19 MW of published IT capacity, currently operational, opened in 2023.
DC BLOX's Myrtle Beach Cable Landing Station, the first subsea cable landing station in South Carolina, opened October 2023 with 19 MW of power and colocation space for up to five subsea cables, two of which are reserved by Google and one by Meta.

- Operator
- DC BLOX
- City
- Myrtle Beach, United States
- Power, MW
- 19 MW
- Cooling
- Air
- Uptime Tier
- III · design certified
- Opened
- 2023
- Floor space
- 3,716 m²
Coloprice Score
54 out of 100
Class C · #13 of 574 in United States
- Resilience16/35
- Compliance6/20
- Transparency11/20
- Scale11/15
- Maturity10/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
DC BLOX's Myrtle Beach facility, opened in October 2023, was the first subsea cable landing station built in South Carolina. Positioned on the coast between existing landing points in Florida and Virginia Beach, it gives subsea cable operators a new entry into the Southeast's growing hyperscale market and connects onward via DC BLOX's dark-fiber route to Atlanta. The station is designed at full build-out for 125,000 sq ft and 19 MW of power (currently around 40,000 sq ft built out), with capacity for up to five subsea cable systems — three of the five slots were reserved as of the operator's latest disclosure, two by Google and one by Meta. Construction is rated to withstand a category 5 hurricane and 170 mph winds, and the facility is engineered to Uptime Institute Tier III concurrently-maintainable standards with SOC 2 Type II and NIST 800-171 compliance. In October 2025 DC BLOX announced plans to acquire roughly 20 adjacent acres within the Myrtle Beach International Technology and Aerospace Park to add up to five more subsea cable slots and another 20 MW of power.
- ▮First subsea cable landing station in South Carolina, opened October 2023
- ▮19 MW power, ~40,000 sq ft built (designed for up to 125,000 sq ft)
- ▮Up to 5 subsea cable slots; 3 reserved (2 Google, 1 Meta)
- ▮Category 5 hurricane / 170 mph wind-rated construction
- ▮Uptime Tier III design; SOC 2 Type II, NIST 800-171; 2025 expansion announced (+20 acres, +20 MW)
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification