▮▮Coloprice

Novva North Las Vegas

Operational

Novva North Las Vegas is a data center in North Las Vegas, NV, United States, operated by Novva Data Centers, with 100 MW of published IT capacity, currently operational, opened in 2023.

A 20-acre, 275,000 sq ft campus in North Las Vegas, Nevada with 100 MW of capacity, built with water-free cooling and a $400 million investment announced alongside a renewable-energy partnership with NV Energy.

Novva North Las Vegas — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Novva Data Centers
City
North Las Vegas, NV, United States
Power, MW
100 MW
Cooling
Air
Opened
2023
Floor space
25,548 m²
AI-ready
Yes
E

Coloprice Score

32 out of 100

Class E · #241 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency9/20
  • Scale13/15
  • Maturity10/10
How the score is calculated →
Embed score badge
Novva North Las Vegas — Coloprice Score 32
<a href="https://coloprice.com/data-centers/usa/north-las-vegas/novva-north-las-vegas/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/novva-north-las-vegas.svg"
    alt="Novva North Las Vegas — Coloprice Score 32" height="64">
</a>

Novva's North Las Vegas facility is a purpose-built 100 MW data center on a 20-acre campus, totaling about 275,000 sq ft (246,328 sq ft of building on the announced plan). The operator announced the $400 million project in 2021 with construction starting that October and the facility targeted to open in late 2023; the current facilities page lists it as an active 100 MW location now taking reservations. Cooling is water-free, using ambient desert air with closed-loop chillers for warmer periods, which Novva says saves an estimated 150–200 million gallons of water a year compared with evaporative designs, and the operator has flagged plans to deploy atmospheric water generation on site. Power is sourced through a renewable-energy partnership with NV Energy and an on-premise substation. Compliance attestations include SOC 1, SOC 2, HIPAA, ISO 27001, ISO 22301 and PCI DSS, but no Uptime Institute or TIA-942 Tier certification is published for the site. No exact street address is disclosed by the operator.

  • 100 MW campus on 20 acres, about 275,000 sq ft, $400 million investment
  • Water-free cooling using ambient desert air and closed-loop chillers
  • Renewable-energy partnership with NV Energy plus an on-premise substation
  • Construction began October 2021, targeted to open late 2023
  • SOC 1/2, ISO 27001, ISO 22301, HIPAA and PCI DSS attestations; no third-party Tier certification published

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification