▮▮Coloprice

Related Digital Saline Township AI Campus ("The Barn", Stargate)

Under construction

Related Digital Saline Township AI Campus ("The Barn", Stargate) is a data center in Saline Township, MI, United States, operated by Related Digital, currently under construction.

A 250-acre, three-building Stargate campus in Saline Township, Michigan announced by OpenAI, Oracle and developer Related Digital for "more than a gigawatt" of AI capacity, with construction pending state approval.

Related Digital Saline Township AI Campus ("The Barn", Stargate) — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · under construction
Operator
Related Digital
City
Saline Township, MI, United States
Power, MW
Cooling
Liquid
Floor space
153,289 m²
AI-ready
Yes

Coloprice Score

10 out of 100

limited data · #719 of 804 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency3/20
  • Scale4/15
  • Maturity3/10
How the score is calculated →
Embed score badge
Related Digital Saline Township AI Campus ("The Barn", Stargate) — Coloprice Score 10
<a href="https://coloprice.com/data-centers/usa/saline-township/related-digital-saline-township-mi/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/related-digital-saline-township-mi.svg"
    alt="Related Digital Saline Township AI Campus ("The Barn", Stargate) — Coloprice Score 10" height="64">
</a>

Announced in October 2025, this Stargate site in Saline Township, Washtenaw County, Michigan is being developed by Related Digital (part of Related Companies) for anchor tenants OpenAI and Oracle. The 250-acre campus is planned as three single-story buildings of 550,000 sq ft each, described by the partners as "more than a gigawatt" of capacity without a precise MW figure. Walbridge is the general contractor and DTE Energy the power supplier, with the design combining a closed-loop cooling system, 100% power sourced from DTE's existing resources plus new battery storage, minimum 75-foot road setbacks, and a preserved historic red barn at the site entrance — the source of the project's local nickname. The project is pending approval from the Michigan Public Service Commission, with construction expected to begin in early 2026, and pursues LEED-certified design. Projected employment includes more than 2,500 union construction jobs and over 450 permanent on-site positions.

  • 250-acre, 3-building campus (550,000 sq ft each) for OpenAI/Oracle's Stargate program
  • "More than a gigawatt" of planned capacity, per the partners — no precise MW published
  • Pending Michigan Public Service Commission approval; construction targeted early 2026
  • Closed-loop cooling, DTE Energy power plus battery storage, LEED-certified design
  • 2,500+ union construction jobs, 450+ permanent positions projected

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification