QTS Richmond 1
OperationalQTS Richmond 1 is a data center in Sandston (Richmond), United States, operated by QTS Data Centers, with 238 MW of published IT capacity, currently operational.
QTS's largest US data center campus, in Sandston near Richmond, Virginia, with 238 MW of capacity across 2.3 million sq ft on a 207-acre site.

- Operator
- QTS Data Centers
- City
- Sandston (Richmond), United States
- Power, MW
- 238 MW
- Cooling
- Air
- Floor space
- 213,700 m²
- Market benchmark
- $196 per kW per month wholesale · United States
- Index rate for the market, not this operator’s price list
- Address
- 6000 Technology Blvd, Sandston, VA 23150 · Open in maps ↗
1 sources · data pending on-site verification
Coloprice Score
31 out of 100
Class E · #342 of 1332 in United States
- Resilience0/35
- Compliance4/20
- Transparency9/20
- Scale11/15
- Maturity7/10
Connectivity: 22 networks and 3 internet exchanges are present in this facility.
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
QTS Richmond 1 occupies a 207-acre campus in Sandston, Virginia, just east of Richmond, and is described by the operator as the largest and most connected data center campus in the area. Five buildings (DC1–DC5) are in current use, with a sixth master-planned, totalling 2.3 million sq ft of space and 238 MW of published capacity — making it the single largest facility in QTS's US portfolio by that measure. The campus draws on an on-site solar power system and sits near an undersea cable landing station, giving it international connectivity alongside its regional reach. QTS states the buildings are LEED Gold certified. As with the rest of QTS's post-Blackstone build-out, Richmond 1 is positioned as wholesale, hyperscale-oriented capacity rather than retail colocation, with room to expand as demand grows.
- ▮238 MW of capacity across 2.3 million sq ft — QTS's largest US campus
- ▮207-acre site with five current buildings (DC1–DC5), a sixth master-planned
- ▮LEED Gold certified
- ▮On-site solar power system; near an undersea cable landing station
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Colocation quotes in Sandston (Richmond): free, reply within one business day
Get Quotes →Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Compare with nearby facilities
| Facility | Operator | Power, MW | Tier | Status | km |
|---|---|---|---|---|---|
| QTS Richmond 1 | QTS Data Centers | 238 | — | Operational | 0 |
| EdgeConneX Richmond | EdgeConneX | — | — | Operational | 26 |
| Pixel Factory Data Center | Pixel Factory Data Center | — | — | Operational | 29 |
Source — Verified against operator sources · data pending on-site verification