▮▮Coloprice

QTS Richmond 1

Operational

6000 Technology Blvd, Sandston, VA 23150

QTS Richmond 1 is a data center in Sandston (Richmond), United States, operated by QTS Data Centers, with 238 MW of published IT capacity, currently operational.

QTS's largest US data center campus, in Sandston near Richmond, Virginia, with 238 MW of capacity across 2.3 million sq ft on a 207-acre site.

QTS Richmond 1 — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
QTS Data Centers
City
Sandston (Richmond), United States
Power, MW
238 MW
Cooling
Air
Floor space
213,700 m²
LEED Gold Certified
E

Coloprice Score

31 out of 100

Class E · #213 of 574 in United States

  • Resilience0/35
  • Compliance4/20
  • Transparency9/20
  • Scale11/15
  • Maturity7/10
How the score is calculated →
Embed score badge
QTS Richmond 1 — Coloprice Score 31
<a href="https://coloprice.com/data-centers/usa/sandston/qts-richmond-1-sandston/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/qts-richmond-1-sandston.svg"
    alt="QTS Richmond 1 — Coloprice Score 31" height="64">
</a>

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

QTS Richmond 1 — Best data center in Sandston (Richmond), United States 2026
#1 of 8 · See the list →

QTS Richmond 1 occupies a 207-acre campus in Sandston, Virginia, just east of Richmond, and is described by the operator as the largest and most connected data center campus in the area. Five buildings (DC1–DC5) are in current use, with a sixth master-planned, totalling 2.3 million sq ft of space and 238 MW of published capacity — making it the single largest facility in QTS's US portfolio by that measure. The campus draws on an on-site solar power system and sits near an undersea cable landing station, giving it international connectivity alongside its regional reach. QTS states the buildings are LEED Gold certified. As with the rest of QTS's post-Blackstone build-out, Richmond 1 is positioned as wholesale, hyperscale-oriented capacity rather than retail colocation, with room to expand as demand grows.

  • 238 MW of capacity across 2.3 million sq ft — QTS's largest US campus
  • 207-acre site with five current buildings (DC1–DC5), a sixth master-planned
  • LEED Gold certified
  • On-site solar power system; near an undersea cable landing station

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Sandston (Richmond)

Source — Verified against operator sources · data pending on-site verification