Vantage Shackelford County Campus (Frontier)
Under constructionVantage Shackelford County Campus (Frontier) is a data center in Shackelford County, TX, United States, operated by Vantage Data Centers, with 1400 MW of published IT capacity, currently under construction.
Vantage's Frontier campus in rural Shackelford County, Texas, a 1,200-acre site announced for a planned 1.4 GW of critical IT load across ten buildings built for GPU-class workloads.

- Operator
- Vantage Data Centers
- City
- Shackelford County, TX, United States
- Power, MW
- 1400 MW
- Cooling
- Liquid
- Floor space
- 343,841 m²
- AI-ready
- Yes
Coloprice Score
25 out of 100
limited data · #340 of 574 in United States
- Resilience0/35
- Compliance0/20
- Transparency7/20
- Scale15/15
- Maturity3/10
Vantage's Frontier campus occupies 1,200 acres in Shackelford County, Texas, a rural stretch a few hours' drive from both Dallas-Fort Worth and Austin and close to Abilene Regional Airport. The operator has announced a planned 1.4 GW of critical IT load across ten single-story data centers and 3.7 million sq ft of space, making it easily the largest campus in Vantage's global portfolio by disclosed capacity. Design targets rack densities up to 1.4 kW/sq ft, with ultra-high-density options above 250 kW per rack, and cooling combines conventional air-cooled chillers with liquid-to-liquid systems built for GPU-class workloads. The site runs N+1 redundancy across mechanical and electrical systems, with three meet-me-rooms per building and multiple diverse fiber paths. Vantage says it is pursuing LEED certification for the campus and has committed to net-zero carbon emissions by 2030. The first data center is scheduled for delivery in the second half of 2026, with construction status reflecting the very early stage of what is presented as a purpose-built AI-scale campus rather than a conventional colocation site.
- ▮Planned 1.4 GW critical IT load across 10 buildings — largest disclosed capacity in Vantage's global portfolio
- ▮1,200-acre campus, 3.7M sq ft, rack densities up to 1.4 kW/sq ft
- ▮Combined air-cooled and liquid-to-liquid cooling built for GPU workloads
- ▮First data center scheduled for delivery H2 2026; pursuing LEED certification
- ▮N+1 redundancy, three MMRs per building, net-zero carbon commitment by 2030
Colocation pricing: United States & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification