▮▮Coloprice

C Spire Systems Operations Center Phase 1A

Operational

C Spire Systems Operations Center Phase 1A is a data center (Uptime Tier III, constructed facility certified) in Starkville, United States, operated by C Spire Advanced Data Solutions, with 1.5 MW of published IT capacity, currently operational, opened in 2014.

C Spire's own commercial colocation data center in Starkville, Mississippi, built in 2014 and certified to Uptime Institute Tier III for both design and constructed facility.

C Spire Systems Operations Center Phase 1A — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
C Spire Advanced Data Solutions
City
Starkville, United States
Power, MW
1.5 MW
Cooling
Air
Uptime Tier
III · constructed facility certified
Opened
2014
Floor space
2,211 m²
Uptime Institute Tier III Certification of Design DocumentsUptime Institute Tier III Certification of Constructed Facility
D

Coloprice Score

48 out of 100

Class D · #35 of 837 in United States

  • Resilience24/35
  • Compliance0/20
  • Transparency9/20
  • Scale6/15
  • Maturity9/10
How the score is calculated →
Embed score badge
C Spire Systems Operations Center Phase 1A — Coloprice Score 48
<a href="https://coloprice.com/data-centers/usa/starkville/c-spire-starkville-phase1a/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/c-spire-starkville-phase1a.svg"
    alt="C Spire Systems Operations Center Phase 1A — Coloprice Score 48" height="64">
</a>

C Spire, a privately held regional telecom carrier based in Mississippi, built this data center at its Starkville campus and opened it in the fall of 2014. The initial phase, known as Phase 1A, covers about 23,800 sq ft on a 6.5-acre site and cost roughly $23 million to construct. Power comes from diesel generators plus multiple independent utility feeds delivering an estimated 1.5 MW, with redundant systems designed to give N+1 protection for critical loads. The facility earned Uptime Institute Tier III certification for both its design documents and its constructed facility, and C Spire markets it commercially as colocation, managed colocation and cloud infrastructure space for third-party customers rather than keeping it purely for internal telecom use. The site sits within the Thad Cochran Research, Technology and Economic Development Park adjoining Mississippi State University, giving it access to the university's fiber and research network. C Spire has discussed the potential for further expansion phases beyond 1A, though only this first phase has confirmed published construction and certification details.

  • Uptime Institute Tier III Certification of Design Documents and Constructed Facility
  • 23,800 sq ft on a 6.5-acre site, built at a cost of roughly $23 million
  • Opened in fall 2014 inside the Thad Cochran Research, Technology and Economic Development Park
  • Marketed commercially for colocation, managed colocation and cloud services
  • Diesel generator backup plus multiple independent utility feeds

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Starkville