Switch The Citadel Campus (TAHOE RENO 1) is a data center in Tahoe Reno, United States, operated by Switch, with 850 MW of published IT capacity, currently operational, opened in 2017.

2,000-acre PRIME campus in the Tahoe Reno Industrial Center designed for up to 17.4 million sq ft and 850 MW at full build, powered by 100% renewable energy.

Switch The Citadel Campus (TAHOE RENO 1) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation
Operator
Switch
City
Tahoe Reno, United States
Power, MW
850 MW
Cooling
Air
Opened
2017
Floor space
120,774 m²
Max density
42 kW/rack
Renewable energy
100%
D

Coloprice Score

36 out of 100

Class D · #217 of 837 in United States

  • Resilience0/35
  • Compliance0/20
  • Transparency15/20
  • Scale11/15
  • Maturity10/10
How the score is calculated →
Embed score badge
Switch The Citadel Campus (TAHOE RENO 1) — Coloprice Score 36
<a href="https://coloprice.com/data-centers/usa/tahoe-reno/switch-citadel-tahoe-reno/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/switch-citadel-tahoe-reno.svg"
    alt="Switch The Citadel Campus (TAHOE RENO 1) — Coloprice Score 36" height="64">
</a>

Few colocation projects match the stated ambition of Switch's Citadel Campus: 2,000 acres in the Tahoe Reno Industrial Center, master-planned for up to 17.4 million square feet of data center space and 850 MW of power. The first building, TAHOE RENO 1, opened in 2017 with up to 1.3 million square feet and 130 MW, built to the Tier IV Gold design standards Switch established in Las Vegas and supporting cabinet densities up to 42 kW. The campus sits next to the Tesla Gigafactory and runs entirely on renewable energy, with Switch holding the only 100 percent Clean Energy Index score in Greenpeace's industry ranking at the time of opening. Connectivity runs over the Switch SUPERLOOP, a roughly 500-mile fiber system that puts Silicon Valley about 4 milliseconds away, Las Vegas 7 and Los Angeles 9, combining Nevada's power economics of around 4.9 cents per kWh with near-Bay Area latency. The Citadel targets hyperscale, AI and enterprise customers deploying at campus scale.

  • 2,000-acre campus planned for 17.4M sq ft, 850 MW
  • TAHOE RENO 1: 1.3M sq ft, 130 MW, opened 2017
  • Up to 42 kW per cabinet
  • 100% renewable energy, ~4.9 cents/kWh power
  • SUPERLOOP fiber: ~4 ms to Silicon Valley

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Tahoe Reno

Source — Verified against operator sources · data pending on-site verification