UzCloud Kokand Data Center (Uztelecom Cloud Hub Kokand 1)
OperationalUzCloud Kokand Data Center (Uztelecom Cloud Hub Kokand 1) is a data center (Uptime Tier III, design certified) in Kokand, Uzbekistan, operated by Uzbektelecom (UzCloud), with 1 MW of published IT capacity, currently operational.
1 MW, 48-rack national-operator site in Kokand, Fergana region, with 10 GPU servers for HPC and AI workloads; holds an Uptime Institute Tier III Certification of Design Documents as Uztelecom Cloud Hub Kokand 1.

- Operator
- Uzbektelecom (UzCloud)
- City
- Kokand, Uzbekistan
- Power, MW
- 1 MW
- Cooling
- Air
- Uptime Tier
- III · design certified
- Racks
- 48
Coloprice Score
35 out of 100
Class D · #2 of 6 in Uzbekistan
- Resilience16/35
- Compliance0/20
- Transparency7/20
- Scale5/15
- Maturity7/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Kokand sits in the densely populated Fergana Valley, and Uzbektelecom's site there is the operator's eastern node, giving the sovereign cloud a presence more than 300 km from the Tashkent-region facilities that carry the bulk of its capacity. The operator publishes 1 MW of power capacity and 48 IT racks, hosting 10 GPU servers, 4,284 CPU cores, 116 TB of RAM and 7.59 PB of storage. It is one of three Uzbektelecom facilities in Uptime Institute's public registry, listed as Uztelecom Cloud Hub Kokand 1 with a Tier III Certification of Design Documents; the operator says Constructed Facility and Operational Sustainability certificates remain in progress across the fleet, so the awarded certificate covers design documents only. Site engineering is published as N+1 redundancy with dual power feeds, diesel generators carrying up to 72 hours of fuel, DWDM transport redundancy and up to 200 Gbps of backbone connectivity, backed by a 99.982 percent SLA and a stated 40 Gbps connection to TAS-IX, the national traffic exchange. For buyers the practical use case is disaster recovery or regional latency relief for Tashkent-primary deployments rather than large-scale capacity, given the modest rack count.
- ▮1 MW and 48 IT racks published by the operator
- ▮10 GPU servers for HPC and AI workloads
- ▮Uptime Institute Tier III Certification of Design Documents
- ▮Over 300 km of geographic separation from the Tashkent-region sites
- ▮99.982% SLA, 72 hours of on-site diesel fuel, up to 200 Gbps backbone
Colocation pricing: Uzbekistan & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
Source — Verified against operator sources · data pending on-site verification