Data Center Colocation Costs in Uzbekistan: Q3 2026 Price Index
Compare 10 data centers in Uzbekistan across 7 operators, 17 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Uzbekistan & other markets — The Colocation Price Index → · Best data centers in Uzbekistan → · Data center companies in Uzbekistan · Colocation pricing and providers in Uzbekistan →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Uztelecom Cloud Hub Tashkent 1 | Uzbektelecom (UzCloud) | Uzbekistan | Tashkent | 1.8 | III | — | data pending | Operational |
| UzCloud Akhangaran Data Center (Uztelecom DC2) | Uzbektelecom (UzCloud) | Uzbekistan | Akhangaran | 1.5 | III | — | 36D | Operational |
| UzCloud Kokand Data Center (Uztelecom Cloud Hub Kokand 1) | Uzbektelecom (UzCloud) | Uzbekistan | Kokand | 1 | III | — | 35D | Operational |
| UzCloud Bukhara Data Center (Uztelecom Cloud Hub Bukhara 1) | Uzbektelecom (UzCloud) | Uzbekistan | Bukhara | 0.8 | III | — | 35D | Operational |
| DataVolt TAS-1 | DataVolt | Uzbekistan | Tashkent | 12 | III* | — | 32E | Under construction |
| East Telecom YA DC | East Telecom | Uzbekistan | Tashkent | — | III* | — | 31E | Operational |
| DC E-GOV Solnechniy (Unified E-Government Data Center) | E-Government Project Management Center | Uzbekistan | Tashkent | — | III | — | 30E | Operational |
| Unitel Bukhara Regional Data Center 1 | Unitel LLC (Beeline Uzbekistan) | Uzbekistan | Bukhara | — | III | — | data pending | Under construction |
| UZSCINET Data Center | UZSCINET | Uzbekistan | Tashkent | — | — | — | data pending | Operational |
| UZINFOCOM Data Center (DC-UZ) | UZINFOCOM | Uzbekistan | Tashkent | — | — | — | data pending | Operational |
Nothing matches the filters
All 10 facilities, A–Z
- DataVolt TAS-1 Tashkent
- DC E-GOV Solnechniy (Unified E-Government Data Center) Tashkent
- East Telecom YA DC Tashkent
- Unitel Bukhara Regional Data Center 1 Bukhara
- UzCloud Akhangaran Data Center (Uztelecom DC2) Akhangaran
- UzCloud Bukhara Data Center (Uztelecom Cloud Hub Bukhara 1) Bukhara
- UzCloud Kokand Data Center (Uztelecom Cloud Hub Kokand 1) Kokand
- UZINFOCOM Data Center (DC-UZ) Tashkent
- UZSCINET Data Center Tashkent
- Uztelecom Cloud Hub Tashkent 1 Tashkent
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.093
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 8 Tier III/IV · 2 AI-ready · 17+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Uzbekistan | · · · | $0.093 | 10 | — |
| Kazakhstan | · · · | $0.090 | 23 | — |
| Kyrgyzstan | · · · | $0.050 | 4 | — |
| Ukraine | · · · | $0.185 | 32 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Uzbekistan's recorded capacity is small and state-adjacent: 15.3 MW across six facilities, four of them Uzbektelecom's UzCloud sites in Akhangaran, Kokand and Bukhara plus the e-government facility outside Tashkent. The largest single project is DataVolt's 12 MW liquid-cooled build in Tashkent IT Park, financed with $150m of non-recourse debt from EBRD, DEG, Proparco and the OPEC Fund — the first internationally financed data center in the country and the only AI-ready site recorded here. Power at $0.093/kWh sits between Kazakhstan's $0.090 and Armenia's $0.122; the tariff for legal entities rose to 1,100 UZS/kWh in June 2026 and is indexed annually. Read the certification column closely before shortlisting: this market holds design certificates only, with no Constructed Facility award anywhere in it. Every tier claim here is about drawings, not about a building that was inspected.
Frequently asked questions
How much does colocation cost in Uzbekistan?
No published wholesale $/kW benchmark exists for Uzbekistan yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 10 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Uzbekistan?
Commercial electricity in Uzbekistan is $0.093 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 10 facilities in our catalog, 2 of them announced or under construction.
Where is colocation cheaper near Uzbekistan?
On power alone, Kazakhstan ($0.090/kWh), Kyrgyzstan ($0.050/kWh) run below Uzbekistan. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Uzbekistan market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Uzbekistan?
Coloprice tracks 10 data centers in Uzbekistan: 8 operational with 5 MW of published IT power, 2 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day