Viettel Cu Chi Data Center
Under constructionTan Phu Trung Industrial Park, Cu Chi District, Ho Chi Minh City
Viettel Cu Chi Data Center is a data center in Ho Chi Minh City (Cu Chi), Vietnam, operated by Viettel, with 140 MW of published IT capacity, currently under construction.
Vietnam's largest data center under construction, designed for 140 MW and about 10,000 racks at Tan Phu Trung Industrial Park in Cu Chi district, built to Uptime Tier III standards.

- Operator
- Viettel
- City
- Ho Chi Minh City (Cu Chi), Vietnam
- Power, MW
- 140 MW
- Cooling
- Air
- Max density
- 60 kW/rack
- AI-ready
- Yes
Coloprice Score
25 out of 100
Class E · #10 of 25 in Vietnam
- Resilience0/35
- Compliance0/20
- Transparency9/20
- Scale13/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Viettel broke ground in April 2025 on what it describes as Vietnam's largest data center to date, a hyperscale-class facility inside Tan Phu Trung Industrial Park in Cu Chi district, roughly 25 km from central Ho Chi Minh City and 15 km from Tan Son Nhat International Airport. The four-hectare site is designed for up to 140 MW of power and around 10,000 racks, positioning it among the region's top ten by capacity once complete. Viettel is building the facility to Uptime Institute Tier III standards, with an average density of 10 kW per rack — 2.5 times the national average — and select racks engineered for up to 60 kW to support high-performance computing and AI training clusters. The operator is targeting a design PUE below 1.4, using its own AI-based infrastructure management software alongside cooling technology it has not detailed publicly. Phase one was slated for service in the first quarter of 2026, with full build-out planned to run through 2030 as Viettel expands beyond its existing Hanoi-area campuses at Hoa Lac and Hoai Duc.
- ▮140 MW design capacity, ~10,000 racks — Viettel's largest data center to date
- ▮Built to Uptime Tier III standard; average 10 kW/rack, up to 60 kW for AI/HPC racks
- ▮Target design PUE below 1.4
- ▮Phase 1 targeted Q1 2026; full build-out planned through 2030
Colocation pricing: Vietnam & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Ho Chi Minh City (Cu Chi)
Source — Verified against operator sources · data pending on-site verification