2 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Zambia: Q3 2026 Price Index
Compare 2 data centers in Zambia across 2 operators: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Zambia & other markets — The Colocation Price Index →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| INFRATEL Data Centre - Production Site | INFRATEL Corporation Limited | Zambia | Lusaka | — | III | — | data pending | Operational |
| Paratus Zambia Data Center | Paratus Group Holdings | Zambia | Lusaka | — | — | — | data pending | Operational |
Nothing matches the filters
All 2 facilities, A–Z
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.055
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Zambia | · · · | $0.055 | 2 | — |
| Tanzania | · · · | $0.089 | 13 | — |
| South Africa | · · · | $0.144 | 42 | — |
| DR Congo | · · · | $0.084 | 4 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Zambia's catalog holds two Lusaka facilities: Paratus Zambia's multi-tenant colocation site at Brentwood Office Park, which the operator describes as carrier-neutral and built to Tier III design principles without a formal Uptime award, and INFRATEL's Production Site data center, part of the state-linked wholesale telecom infrastructure company's network and the only Zambian facility to hold an actual Uptime Institute Tier III Certification of Design Documents. Business electricity runs $0.055/kWh (GlobalPetrolPrices, Dec 2025), among the lower rates the catalog tracks in Southern Africa, reflecting a grid still overwhelmingly dependent on Zambezi River hydropower, though recent drought cycles have periodically forced load-shedding across the system.
Frequently asked questions
How much does colocation cost in Zambia?
No published wholesale $/kW benchmark exists for Zambia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Zambia?
Commercial electricity in Zambia is $0.055 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Zambia?
Zambia sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Zambia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Zambia?
Coloprice tracks 2 data centers in Zambia: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.