Coloprice tracks one TM Nxera (Telekom Malaysia / Nxera-Singtel JV) facility: TM Nxera Data Centre Campus — Iskandar Puteri in Iskandar Puteri, Malaysia. It publishes 200 MW of IT capacity.

By status: 1 under construction. No certifications are published for these facilities yet.

Key facts

Facilities
1
Countries
Malaysia
Cities
1
Published capacity
200 MW (1 of 1 facilities publish MW)
Status
1 under construction
Certifications
not published
Sources
Telekom Malaysia — TM Nxera achieves new heights with topping-out ceremony for AI-ready data centre in Johor · Telekom Malaysia — TM Nxera secures 280MW to power AI-ready, green data centre campus in Johor

Figures are aggregated from the facility cards below. Capacity is summed only where the operator publishes MW, so totals are floors, not estimates.

Coloprice Score of TM Nxera (Telekom Malaysia / Nxera-Singtel JV)

Average score
22 out of 100 across 1 facilities
Best facility
TM Nxera Data Centre Campus — Iskandar Puteri · 22·
Class distribution
limited data 1

Each facility is scored on its own from published, source-cited data; the operator figure is a plain average. How the score is calculated.

TM Nxera (Telekom Malaysia / Nxera-Singtel JV) facilities in the catalog

FacilityLocationMWScoreStatus
TM Nxera Data Centre Campus — Iskandar PuteriIskandar Puteri, Malaysia20022·Under construction

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

All reviews →

← All operators · ← All facilities

Operate these facilities? Claim the profile — free data check and badges →

Represent TM Nxera (Telekom Malaysia / Nxera-Singtel JV)? Claim and verify these listings — corrections ship within a week.

Claim listings