TM Nxera Data Centre Campus — Iskandar Puteri
Under constructionTM Nxera Data Centre Campus — Iskandar Puteri is a data center in Iskandar Puteri, Malaysia, operated by TM Nxera (Telekom Malaysia / Nxera-Singtel JV), with 200 MW of published IT capacity, currently under construction.
TM Nxera's Iskandar Puteri campus in Johor, backed by a 280 MW TNB power deal and liquid cooling for AI workloads, is targeting first-phase commercial operations in H2 2026.

- Operator
- TM Nxera (Telekom Malaysia / Nxera-Singtel JV)
- City
- Iskandar Puteri, Malaysia
- Power, MW
- 200 MW
- Cooling
- Liquid
- AI-ready
- Yes
Coloprice Score
22 out of 100
limited data · #23 of 41 in Malaysia
- Resilience0/35
- Compliance0/20
- Transparency4/20
- Scale15/15
- Maturity3/10
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Telekom Malaysia and Singtel's Nxera unit broke ground in July 2024 on a joint-venture, AI-ready data centre campus in Iskandar Puteri, Johor, inside the Johor-Singapore Special Economic Zone roughly 17 km from the Singapore border. TM Nxera secured a 280 MW multi-year electricity supply agreement with Tenaga Nasional in January 2026 to back a campus designed for more than 200 MW of scalable IT capacity, using advanced liquid cooling for high-density AI workloads. The first building topped out structurally in April 2026, and TM Nxera has targeted the first phase for commercial operations in the second half of 2026. The developers are targeting Power Usage Effectiveness of 1.30 or better at full load, Uptime Institute Tier III design standards, and LEED certification for sustainability. Connectivity runs over TM and Singtel Digital InfraCo's terrestrial fibre and subsea cable networks, positioning the campus to serve cloud hyperscalers and GPU-as-a-service tenants seeking Singapore-adjacent capacity without Singapore's land and power constraints.
- ▮280 MW electricity supply agreement with Tenaga Nasional, signed January 2026
- ▮Campus designed for 200+ MW scalable IT capacity
- ▮Advanced liquid cooling for AI/GPU workloads
- ▮Topping-out ceremony April 2026; first phase targeted for H2 2026
- ▮Targeting Uptime Tier III design standards, PUE ≤1.30, LEED certification
Colocation pricing: Malaysia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Iskandar Puteri
Source — Verified against operator sources · data pending on-site verification