Market comparison
Helsinki, Finland vs Tampere, Finland
Both columns are built from the catalog and the price index: Helsinki — 12 facilities from 9 operators, Tampere — 3 facilities from 3 operators. Where a benchmark or a tariff is not published, the cell says so.
Helsinki, Finland
12
Tracked facilities · Operators: 9
Wholesale benchmark, $/kW/month: not published
Tampere, Finland
3
Tracked facilities · Operators: 3
Wholesale benchmark, $/kW/month: not published
Markets side by side
| Field | Helsinki | Tampere |
|---|---|---|
| Tracked facilities | 12 | 3 |
| Operators | 9 | 3 |
| Published IT capacity | 66 MW (3 of 12 sites publish) | not published |
| Operational | 12 | 3 |
| Under construction / announced | 0 | 0 |
| Tier III+ certified sites | 0 | 0 |
| Sites with any certification | 6 | 0 |
| Liquid-cooled sites | 1 | 0 |
| AI-ready sites | 2 | 0 |
| Wholesale benchmark, $/kW/month | not published | not published |
| Benchmark change, yoy | not published | not published |
| Industrial power tariff, $/kWh | $0.105 | $0.105 |
| Average Coloprice Score | 24/100 across 12 sites | 9/100 across 3 sites |
| Latency between the two | not published | |
Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Tracked facilities: Helsinki — 12; Tampere — 3
- Operators: Helsinki — 9; Tampere — 3
- Operational: Helsinki — 12; Tampere — 3
- Sites with any certification: Helsinki — 6; Tampere — 0
- Liquid-cooled sites: Helsinki — 1; Tampere — 0
- AI-ready sites: Helsinki — 2; Tampere — 0
- Average Coloprice Score: Helsinki — 24/100 across 12 sites; Tampere — 9/100 across 3 sites
Published for only one side: Published IT capacity.
Top facilities by score
Helsinki, Finland
- Telia Helsinki Data Center (HDC) Telia Finland · 24 MW
- Equinix HE3 Equinix
- Equinix HE5 Equinix
Tampere, Finland
- Tampere Hallituskatu 14 Lahtiset Yhtymä
- Elisa Tampere Nalkala Elisa
- Glesys Tampere 1 GleSYS
Open Helsinki data centers →Open Tampere data centers →Colocation pricing in Helsinki →Colocation pricing in Tampere →