Market comparison
Davao City, Philippines vs General Trias, Cavite, Philippines
Both columns are built from the catalog and the price index: Davao City — 3 facilities from 3 operators, General Trias, Cavite — 3 facilities from 2 operators. Where a benchmark or a tariff is not published, the cell says so.
Davao City, Philippines
3
Tracked facilities · Operators: 3
Wholesale benchmark, $/kW/month: not published
General Trias, Cavite, Philippines
3
Tracked facilities · Operators: 2
Wholesale benchmark, $/kW/month: not published
Markets side by side
| Field | Davao City | General Trias, Cavite |
|---|---|---|
| Tracked facilities | 3 | 3 |
| Operators | 3 | 2 |
| Published IT capacity | 1 MW (1 of 3 sites publish) | 110 MW (3 of 3 sites publish) |
| Operational | 3 | 1 |
| Under construction / announced | 0 | 2 |
| Tier III+ certified sites | 0 | 1 |
| Sites with any certification | 0 | 1 |
| Liquid-cooled sites | 0 | 0 |
| AI-ready sites | 0 | 1 |
| Wholesale benchmark, $/kW/month | not published | not published |
| Benchmark change, yoy | not published | not published |
| Industrial power tariff, $/kWh | not published | not published |
| Average Coloprice Score | 10/100 across 3 sites | 24/100 across 3 sites |
| Latency between the two | not published | |
Counts are the Coloprice catalog as of 2026-10-01; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.
Where they differ
Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.
- Operators: Davao City — 3; General Trias, Cavite — 2
- Published IT capacity: Davao City — 1 MW (1 of 3 sites publish); General Trias, Cavite — 110 MW (3 of 3 sites publish)
- Operational: Davao City — 3; General Trias, Cavite — 1
- Under construction / announced: Davao City — 0; General Trias, Cavite — 2
- Tier III+ certified sites: Davao City — 0; General Trias, Cavite — 1
- Sites with any certification: Davao City — 0; General Trias, Cavite — 1
- AI-ready sites: Davao City — 0; General Trias, Cavite — 1
- Average Coloprice Score: Davao City — 10/100 across 3 sites; General Trias, Cavite — 24/100 across 3 sites
Top facilities by score
Davao City, Philippines
- STT Davao STT GDC Philippines · 0.5 MW
- VITRO Davao VITRO
- Globe Data Center DV1 (Davao) Globe Telecom (GTI Corporation)
General Trias, Cavite, Philippines
- STT Cavite 1 STT GDC Philippines · 4 MW
- STT Cavite 2 STT GDC Philippines · 6 MW
- PLDT VITRO Cavite Data Center PLDT / VITRO Inc. · 100 MW
Open Davao City data centers →Open General Trias, Cavite data centers →Colocation pricing in Davao City →Colocation pricing in General Trias, Cavite →
Other comparisons
Davao City vs Greater Manila (Biñan, Laguna)Clark, Pampanga vs Davao CityGeneral Trias, Cavite vs Greater Manila (Biñan, Laguna)Clark, Pampanga vs General Trias, Cavite