Gdańsk, Poland vs Warsaw, Poland

Both columns are built from the catalog and the price index: Gdańsk — 3 facilities from 3 operators, Warsaw — 17 facilities from 11 operators. Where a benchmark or a tariff is not published, the cell says so.

Markets side by side

FieldGdańskWarsaw
Tracked facilities317
Operators311
Published IT capacity1 MW (1 of 3 sites publish)154 MW (8 of 17 sites publish)
Operational316
Under construction / announced01
Tier III+ certified sites00
Sites with any certification212
Liquid-cooled sites01
AI-ready sites01
Wholesale benchmark, $/kW/monthnot publishednot published
Benchmark change, yoynot publishednot published
Industrial power tariff, $/kWh$0.177$0.177
Average Coloprice Score25/100 across 3 sites28/100 across 17 sites
Latency between the twonot published

Counts are the Coloprice catalog as of 2026-09-26; benchmarks are the Colocation Price Index (Q3 2026). Operators publish some facts and not others — an empty cell means «not published», not zero.

Where they differ

Only fields both sides publish and where the values are not identical. This is not a judgement: the right choice depends on the workload, the contract and the site.

  • Tracked facilities: Gdańsk — 3; Warsaw — 17
  • Operators: Gdańsk — 3; Warsaw — 11
  • Published IT capacity: Gdańsk — 1 MW (1 of 3 sites publish); Warsaw — 154 MW (8 of 17 sites publish)
  • Operational: Gdańsk — 3; Warsaw — 16
  • Under construction / announced: Gdańsk — 0; Warsaw — 1
  • Sites with any certification: Gdańsk — 2; Warsaw — 12
  • Liquid-cooled sites: Gdańsk — 0; Warsaw — 1
  • AI-ready sites: Gdańsk — 0; Warsaw — 1
  • Average Coloprice Score: Gdańsk — 25/100 across 3 sites; Warsaw — 28/100 across 17 sites

Top facilities by score

Gdańsk, Poland

Warsaw, Poland

Open Gdańsk data centers →Open Warsaw data centers →Colocation pricing in Gdańsk →Colocation pricing in Warsaw →

Other comparisons

Gdańsk vs WrocławGdańsk vs ŁódźWarsaw vs WrocławŁódź vs Warsaw