▮▮Coloprice
← Poland

5 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data centers in Gdańsk: 5 facilities, colocation pricing

Colocation pricing and providers in Gdańsk →

How many data centers are in Gdańsk?

Coloprice tracks 5 data centers in Gdańsk, Poland: 5 operational, 0 under construction and 0 announced, run by 5 operators.

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.177

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 0 AI-ready · 1+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Gdańsk, Poland· · ·$0.1775—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Frequently asked questions

How many data centers are in Gdańsk?

Coloprice tracks 5 data centers in Gdańsk, Poland: 5 operational, 0 under construction and 0 announced, run by 5 operators.

Which operators run data centers in Gdańsk?

By number of facilities tracked: 3S Data Center (Play/P4) (1), IQ PL (1), PCPD (Pomorskie Centrum Przetwarzania Danych) (1), Orange Polska (1), Artnet Spolka z ograniczona odpowiedzialnoscia (1).

What is the total data center power capacity in Gdańsk?

Facilities that publish capacity add up to 1 MW (1 of 5 sites disclose a figure); the largest published site is 3S Data Center Gdańsk with 0.8 MW.

How much does colocation cost in Gdańsk, Poland?

No published wholesale $/kW benchmark exists for Gdańsk, Poland yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 5 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Gdańsk, Poland?

Commercial electricity in Gdańsk, Poland is $0.177 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 5 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Gdańsk, Poland?

Gdańsk, Poland sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Gdańsk, Poland market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Data centers

FacilityOperatorPower, MWTierStatus
3S Data Center Gdańsk3S Data Center (Play/P4)0.8—Operational
IQ PL Data Center GdańskIQ PL——Operational
PCPD Data Center GdańskPCPD (Pomorskie Centrum Przetwarzania Danych)——Operational
Orange Polska // GdańskOrange Polska——Operational
Artnet DC Gdansk MP100Artnet Spolka z ograniczona odpowiedzialnoscia——Operational

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.