9 facilities · 2 operators · 101 MW tracked
Colocation in Osasco: pricing, providers and capacity
2 operators run 9 tracked data centers in Osasco (8 operational, 101+ MW published, 1 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Osasco?
2 operators run 9 tracked data centers in Osasco; the largest by sites is Ascenty (Digital Realty) (8). There is no city-level benchmark for Osasco; the closest published wholesale figure is São Paulo at $160 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$160 /kW·mo
São Paulo · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
250–500 kW requirement; midpoint of the published range
Published retail prices
No operator in Osasco publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Osasco
Operators with tracked data centers in Osasco, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Ascenty (Digital Realty) | 8 / 7 | 99 | Ascenty São Paulo 5 | Tier III, ISO 14001, ISO 27001 | — |
| Aligned Data Centers | 1 / 1 | 2 | Aligned SP-04 (Osasco) | not published | 1 |
Availability in Osasco: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Osasco?
By tracked sites: Ascenty (Digital Realty) with 8. By published IT capacity: Ascenty (Digital Realty) with 99 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Osasco, including some that do not sell space.
Is there colocation capacity available in Osasco right now?
Coloprice tracks 9 facilities here (8 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Osasco?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the São Paulo benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Osasco
One brief, several operators with capacity in Osasco, Brazil, same terms. Independent — no operator pays for position.
Colocation in Osasco? One brief, several quotes.