Aligned Data Centers data centers
Coloprice tracks 40 Aligned Data Centers facilities across 5 countries (United States, Brazil, Mexico, Chile, Colombia) and 31 cities. 16 of 40 publish IT capacity — 2935 MW combined; the rest do not disclose power.
By status: 34 operational · 4 under construction · 2 announced. Certifications reported across these facilities include ISO 27001, PCI DSS, SOC 2 Type 2, HIPAA, HITECH, NIST 800-53.
Key facts
- Facilities
- 40
- Countries
- United States, Brazil, Mexico, Chile, Colombia
- Cities
- 31
- Published capacity
- 2935 MW (16 of 40 facilities publish MW)
- Status
- 34 operational · 4 under construction · 2 announced
- Certifications
- ISO 27001, PCI DSS, SOC 2 Type 2, HIPAA, HITECH, NIST 800-53
- Website
- aligneddc.com
- Sources
- Aligned Data Centers — Phoenix · Aligned Data Centers — Phoenix · Aligned Data Centers — Dallas
Figures are aggregated from the facility cards below. Capacity is summed only where the operator publishes MW, so totals are floors, not estimates.
Coloprice Score of Aligned Data Centers
- Average score
- 32 out of 100 across 40 facilities
- Best facility
- Aligned SLC-03 (West Jordan) · 52C
- Class distribution
- C 6D 7E 20limited data 7
Each facility is scored on its own from published, source-cited data; the operator figure is a plain average. How the score is calculated.
Aligned Data Centers facilities in the catalog
United States (26)
| Facility | Location | MW | Score | Status |
|---|---|---|---|---|
| Aligned Phoenix Campus (PHX-01/02/03) | Phoenix, United States | — | 41D | Operational |
| Aligned PHX-04 (Chandler) | Phoenix (Chandler), United States | — | 37D | Operational |
| Aligned PHX-06 (Chandler) | Phoenix (Chandler), United States | — | 37D | Operational |
| Aligned PHX-07 (Waddell) | Waddell, United States | — | 29E | Operational |
| Aligned DFW-01 (Plano) | Plano, United States | 30 | 51C | Operational |
| Aligned DFW-02 (Plano) | Plano, United States | 36 | 51C | Operational |
| Aligned DFW-03 (Mansfield) | Mansfield, United States | — | 29E | Under construction |
| Aligned DFW-04 (Plano) | Plano, United States | — | 33E | Operational |
| Aligned IAD-01 (Ashburn) | Ashburn, United States | 60 | 51C | Operational |
| Aligned IAD-02 (Ashburn) | Ashburn, United States | 120 | 51C | Operational |
| Aligned IAD-03 (Sterling) | Sterling, United States | — | 33E | Operational |
| Aligned IAD-04 (Frederick, MD) | Frederick, United States | — | 33E | Operational |
| Aligned SLC-01 (West Jordan) | West Jordan, United States | — | 33E | Operational |
| Aligned SLC-02 (West Jordan) | West Jordan, United States | — | 33E | Operational |
| Aligned SLC-03 (West Jordan) | West Jordan, United States | 100 | 52C | Operational |
| Aligned SLC-04 (West Valley City) | West Valley City, United States | — | 33E | Operational |
| Aligned ORD-01 (Northlake) | Northlake, United States | — | 37D | Operational |
| Aligned ORD-02 (Northlake) | Northlake, United States | 36 | 51C | Operational |
| Aligned ORD-03 (Elk Grove Village) | Elk Grove Village, United States | — | 33E | Operational |
| Aligned NEO-01 (Sandusky) | Sandusky, United States | — | 33E | Operational |
| Aligned CMH-02 (Conesville) | Conesville, United States | — | 29E | Under construction |
| Aligned ATL-01 (Lithia Springs) | Atlanta (Lithia Springs), United States | — | 33E | Operational |
| Aligned PDX-01 (Hillsboro) | Portland (Hillsboro), United States | — | 33E | Operational |
| Aligned LBB-01 (Project Caprock, Abernathy) | Abernathy, United States | 540 | 27E | Under construction |
| Aligned Salt Lake City Campus (SLC-01/02/03/04) | Salt Lake City, United States | — | 34E | Operational |
| Aligned Data Centers Project Phoenix | Shippingport, Pennsylvania, United States | 2000 | 22· | Under construction |
Brazil (5)
| Facility | Location | MW | Score | Status |
|---|---|---|---|---|
| Aligned SP-01 (Santana de Parnaíba) | Santana de Parnaíba, Brazil | 1 | 36D | Operational |
| Aligned SP-02 (Hortolândia) | Hortolândia, Brazil | 1.33 | 37D | Operational |
| Aligned SP-03 (Barueri) | Barueri, Brazil | 1.6 | 22E | Operational |
| Aligned SP-04 (Osasco) | Osasco, Brazil | 2 | 27E | Operational |
| Aligned RJ-01 (São João de Meriti) | São João de Meriti, Brazil | 1.33 | 31E | Operational |
Mexico (4)
| Facility | Location | MW | Score | Status |
|---|---|---|---|---|
| Aligned QR-01 (Querétaro) | Querétaro, Mexico | — | 12· | Operational |
| Aligned QR-02 (Querétaro) | Querétaro, Mexico | — | 12· | Operational |
| Aligned QR-03 (San Juan del Río) | San Juan del Río, Mexico | — | 12· | Operational |
| Aligned QR-04 (San Miguel de Allende) | San Miguel de Allende, Mexico | — | 12· | Operational |
Chile (2)
| Facility | Location | MW | Score | Status |
|---|---|---|---|---|
| Aligned ST-01 (Lampa) | Lampa, Chile | 1.8 | 33E | Operational |
| Aligned ST-02 (San Bernardo) | San Bernardo, Chile | 1.33 | 22E | Operational |
Colombia (3)
| Facility | Location | MW | Score | Status |
|---|---|---|---|---|
| Aligned BG-01 (Cota) | Cota, Colombia | 2.4 | 41D | Operational |
| Aligned BG-02 (Mosquera) | Mosquera, Colombia | — | 2· | Announced |
| Aligned BG-03 (Tenjo) | Tenjo, Colombia | — | 2· | Announced |
Operator vs operator
Aligned Data Centers vs Tecto Data CentersAligned Data Centers vs KIO NetworksAligned Data Centers vs Scala Data CentersAligned Data Centers vs Ascenty (Digital Realty)
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
← All operators · ← All facilities
Operate these facilities? Claim the profile — free data check and badges →
Represent Aligned Data Centers? Claim and verify these listings — corrections ship within a week.
Claim listings