21 facilities · 15 operators · 27 MW tracked
Colocation in Bogotá: pricing, providers and capacity
15 operators run 21 tracked data centers in Bogotá (18 operational, 27+ MW published, 1 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Bogotá?
15 operators run 21 tracked data centers in Bogotá; the largest by sites is Ascenty (Digital Realty) (2). There is no city-level benchmark for Bogotá; the closest published wholesale figure is Bogotá at $190 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$190 /kW·mo
Bogotá · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
Published retail prices
No operator in Bogotá publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Bogotá
Operators with tracked data centers in Bogotá, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Ascenty (Digital Realty) | 2 / 2 | 20 | Ascenty Bogotá 1 | not published | — |
| Cirion Technologies | 2 / 2 | 7 | Cirion BOG2 | ISO 9001, ISO 27001, ISO 27017 | — |
| Desarrolladora de Zonas Francas S.A. (ZFB Group) | 2 / 2 | not published | ZF Towers DC38 | Uptime Institute Tier III Certification of Design Documents, ANSI/TIA-942-C Facility - Rated 3, EPI DCOS:2021 Maturity Level 3 | — |
| EdgeConneX | 2 / 1 | not published | EdgeConneX BOG11 | not published | — |
| Equinix | 2 / 2 | not published | Equinix BG2 IBX | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| Scala Data Centers | 2 / 0 | not published | Scala Zona Franca Bogotá (SBOGZB01) | not published | — |
| Andean Tower Partners Colombia S.A.S. | 1 / 1 | not published | Orion Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| Claro Colombia | 1 / 1 | not published | Claro Ortezal | not published | — |
| Cotel | 1 / 1 | not published | Cotel Data Center BT Naos | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility, ANSI/TIA-942-C Facility - Rated 4 | — |
| Grupo ASD SAS | 1 / 1 | not published | Monserrate Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | 1 |
| IFX Networks Colombia S.A.S. | 1 / 1 | not published | Jupiter Data | Uptime Institute Tier III Certification of Constructed Facility | — |
| KIO Colombia Zetta Complex Operation S.A.S. (KIO Networks) | 1 / 1 | not published | KIO BOG 1 | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| SONDA Colombia S.A. | 1 / 1 | not published | KUDOS.CO, Phase 1 | Uptime Institute Tier IV Certification of Design Documents | — |
| Takoda Data Centers | 1 / 1 | not published | Takoda BG01 | Tier III equivalent (operator statement) | — |
| UNE EPM Telecomunicaciones (Tigo Colombia) | 1 / 1 | not published | Titanium Data Center Tigo Bogotá | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Gold Certification of Operational Sustainability | — |
Availability in Bogotá: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Bogotá?
By tracked sites: Ascenty (Digital Realty) with 2. By published IT capacity: Ascenty (Digital Realty) with 20 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Bogotá, including some that do not sell space.
Is there colocation capacity available in Bogotá right now?
Coloprice tracks 21 facilities here (18 operational, 3 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Bogotá?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Bogotá benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Bogotá
One brief, several operators with capacity in Bogotá, Colombia, same terms. Independent — no operator pays for position.
Colocation in Bogotá? One brief, several quotes.
Request quotes →