26 facilities · 17 operators · 133 MW tracked
Colocation in Hong Kong (Tsuen Wan): pricing, providers and capacity
17 operators run 26 tracked data centers in Hong Kong (Tsuen Wan) (26 operational, 133+ MW published, 4 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Hong Kong (Tsuen Wan)?
17 operators run 26 tracked data centers in Hong Kong (Tsuen Wan); the largest by sites is Equinix (6). There is no city-level benchmark for Hong Kong (Tsuen Wan); the closest published wholesale figure is Hong Kong at $295 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$295 /kW·mo
Hong Kong · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
Q1 2026 average, up from $270 a year earlier
Published retail prices
No operator in Hong Kong (Tsuen Wan) publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Hong Kong (Tsuen Wan)
Operators with tracked data centers in Hong Kong (Tsuen Wan), sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Equinix | 6 / 6 | not published | Equinix HK6 | ISO 27001, PCI DSS, ISO 9001 | 1 |
| Vantage Data Centers | 3 / 3 | 32 | Vantage Kwai Chung Campus (HKG3) | ISO 9001, ISO 27001, Uptime Tier III Certification of Design | — |
| BDx Data Centers | 2 / 2 | not published | BDx Hong Kong — Aberdeen (The Hub) | DCOS:2021 Maturity Level 3, ANSI/TIA-942-B Facility - Rated 3 | — |
| Digital Realty | 2 / 2 | not published | Digital Realty HKG10 | not published | — |
| Global Switch | 1 / 1 | 71 | Global Switch Hong Kong | LEED Platinum, OCP Ready | 1 |
| NTT Global Data Centers | 1 / 1 | 30 | NTT Hong Kong Financial Data Center Tower 2 (FDC2) | Uptime Tier IV (design) | — |
| China Mobile | 1 / 1 | not published | China Mobile Global Intelligence Center | not published | 1 |
| China Mobile Hong Kong | 1 / 1 | not published | CMHK Tai Ping Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| China Telecom Global | 1 / 1 | not published | China Telecom Global AI Data Center | Uptime Institute Tier III Certification of Design Documents | 1 |
| China Unicom | 1 / 1 | not published | China Unicom Hong Kong Cloud Data Centre | not published | — |
| CITIC Telecom International | 1 / 1 | not published | CITIC Telecom Tower (CTT), Phase 3B | Uptime Institute Tier III Certification of Design Documents | — |
| Data Zone Company Limited | 1 / 1 | not published | HK2 Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| GDS Holdings | 1 / 1 | not published | HK1 | Uptime Institute M&O Stamp of Approval | — |
| OneAsia Network | 1 / 1 | not published | OA-HK4 DC3-2 Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| PCCW Powerbase | 1 / 1 | not published | SLC Data Center, Phase 1 | Uptime Institute Tier III Certification of Design Documents | — |
| SUNeVision (iAdvantage) | 1 / 1 | not published | SUNeVision MEGA Plus | LEED Gold | — |
| Telehouse | 1 / 1 | not published | Telehouse Hong Kong CCC | TIA-942 Rated 4 | — |
Availability in Hong Kong (Tsuen Wan): what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Hong Kong (Tsuen Wan)?
By tracked sites: Equinix with 6. By published IT capacity: Global Switch with 71 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Hong Kong (Tsuen Wan), including some that do not sell space.
Is there colocation capacity available in Hong Kong (Tsuen Wan) right now?
Coloprice tracks 26 facilities here (26 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Hong Kong (Tsuen Wan)?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Hong Kong benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Hong Kong (Tsuen Wan)
One brief, several operators with capacity in Hong Kong (Tsuen Wan), Hong Kong, same terms. Independent — no operator pays for position.
Colocation in Hong Kong (Tsuen Wan)? One brief, several quotes.
Request quotes →