15 facilities · 11 operators · 12 MW tracked

Colocation in Iraq: pricing, providers and markets

11 operators run 15 tracked data centers in Iraq across 2 cities with at least three sites (14 operational, 12+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Iraq?

11 operators run 15 tracked data centers in Iraq; the largest by sites is Asiacell (4). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Iraq publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Iraq

Operators with tracked data centers in Iraq, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Asiacell4 / 4not publishedAsiacell Erbil Data Center 2Uptime Institute Tier III Design & Constructed Facility (Erbil Data Center - 2), Uptime Institute Tier III Design (Baghdad Airport Modular Data Center), Uptime Institute Tier III Design (Asiacell Baghdad Digital Campus DC1)—
International Smart Card QiCard2 / 2not publishedInternational Smart Card QiCard ISC QiCard Payment Erbil Data CenterUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
T9641 / 012T964 Data Centernot published—
Earthlink Telecommunications1 / 1not publishedEarthlink Telecommunications DC1Uptime Institute Tier III Design & Constructed Facility (Earthlink Telecommunications DC1)—
GSL Telecom (Golden Sky Links)1 / 1not publishedGSL Telecom Data Centernot published—
National Bank of Iraq1 / 1not publishedNational Bank of Iraq Main Data Center-01Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Newroz Telecom1 / 1not publishedNewroz Telecom JISIR Data CenterUptime Institute Tier IV Design (JISIR Data Center)—
Republic of Iraq - Ministry of Interior (MOI)1 / 1not publishedRepublic of Iraq - Ministry of Interior (MOI) Iraq Ministry of Interior Digital DatacenterUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Republic of Iraq - Ministry of Planning - Commission of Statistic and Geographic Information Systems1 / 1not publishedRepublic of Iraq - Ministry of Planning - Commission of Statistic and Geographic Information Systems Commission of Statistic and GIS Data CenterUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Smart Solution for Digital Marketing and Information Technology1 / 1not publishedBGD SmartSolution.Dawodi Data CenterUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Zain Iraq (Atheer Telecom)1 / 1not publishedZain Iraq HQ Data CenterUptime Institute Tier III Certification of Design Documents—

Colocation markets in Iraq

CitySites / livePublished MW
Colocation in Baghdad912
Colocation in Erbil4not published

Availability in Iraq: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Iraq?

By tracked sites: Asiacell with 4. By published IT capacity: T964 with 12 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Iraq, including some that do not sell space.

Is there colocation capacity available in Iraq right now?

Coloprice tracks 15 facilities here (14 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Iraq?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Iraq

One brief, several operators with capacity in Iraq, same terms. Independent — no operator pays for position.