14 facilities · 10 operators · 6 MW tracked
Colocation in Jordan: pricing, providers and markets
10 operators run 14 tracked data centers in Jordan across 2 cities with at least three sites (13 operational, 6+ MW published, 1 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Jordan?
10 operators run 14 tracked data centers in Jordan; the largest by sites is 35D (Aqaba Digital Hub) (2). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Jordan publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Jordan
Operators with tracked data centers in Jordan, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| 35D (Aqaba Digital Hub) | 2 / 2 | 6 | 35D South Beach Mega Data Center | Uptime Institute Tier III Design & Constructed Facility (35D-JAQ01 Data Center), Uptime Institute Tier III Design & Constructed Facility (Aqaba Digital Hub Data Center Data Hall 1 & CLS Unit) | 1 |
| Al Mirnaah for Investment and Business Development | 2 / 2 | not published | Al Mirnaah for Investment and Business Development 35D-JAQ01 Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Orange Jordan | 2 / 2 | not published | Orange Jordan Marj Al-Hammam Data Center | Uptime Institute Tier III Design, Constructed Facility & Gold Operational Sustainability (Marj Al-Hammam Data Center), Uptime Institute Tier III Design (Hashem Data Center) | — |
| Umniah (Beyon) | 2 / 1 | not published | Umniah Dahiyat Al-Rasheed Colocation Room | Uptime Institute Tier III Design & Constructed Facility (Dahiyat Al-Rasheed Colocation Room), Uptime Institute Tier III Design (Delmon-Amman Umniah by Beyon Data Center) | — |
| Arab Bank | 1 / 1 | not published | Arab Bank Head Office Data Center, Ground Floor | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Housing Bank for Trade and Finance | 1 / 1 | not published | Housing Bank for Trade and Finance Primary Data Center | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Jordan Telecom Group – Orange Jordan | 1 / 1 | not published | Jordan Telecom Group – Orange Jordan Marj Al-Hammam Data Center | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability | — |
| JORSIT (Jordanian Specialists for Information Security) | 1 / 1 | not published | JORSIT RAID DC1 | Uptime Institute Tier IV Design (RAID DC1) | — |
| VTEL Jordan | 1 / 1 | not published | VTEL Central DC | Uptime Institute Tier III Design & Constructed Facility (VTEL Central DC) | — |
| Zain Jordan | 1 / 1 | not published | Zain Jordan Data Center & Disaster Recovery Bunker | Uptime Institute Tier III Design, Constructed Facility & Gold Operational Sustainability (Zain Data Center & Disaster Recovery Bunker) | — |
Colocation markets in Jordan
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Amman | 9 | not published |
| Colocation in Aqaba | 4 | 6 |
Availability in Jordan: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Jordan?
By tracked sites: 35D (Aqaba Digital Hub) with 2. By published IT capacity: 35D (Aqaba Digital Hub) with 6 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Jordan, including some that do not sell space.
Is there colocation capacity available in Jordan right now?
Coloprice tracks 14 facilities here (13 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Jordan?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.