Colocation in Poland: pricing, providers and markets
23 operators run 35 tracked data centers in Poland across 5 cities with at least three sites (34 operational, 221+ MW published, 2 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Poland?
23 operators run 35 tracked data centers in Poland; the largest by sites is Equinix (4). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Poland publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Poland
Operators with tracked data centers in Poland, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Equinix | 4 / 4 | not published | Equinix WA1 | ISO 22301, ISO 27001, ISO 9001 | — |
| Atman | 3 / 3 | 32 | Atman WAW-3 | ISO 9001, ISO/IEC 27001:2022, PCI DSS | 1 |
| T-Mobile Polska | 3 / 3 | not published | T-Mobile Data Center Wrocław | ANSI/TIA-942 Rated-3 (operator-stated), EN 50600 Class 3 (operator-stated), ISO/IEC 27001:2013 | — |
| Beyond.pl | 2 / 2 | 44 | Beyond.pl Data Center 2 | ISO/IEC 27001, ANSI/TIA-942 Rated 4, EN 50600 Class 4 | 1 |
| Orange Polska | 2 / 2 | 8 | Orange Warsaw Data Hub | PN-EN 50600 Class 3 | — |
| Comarch | 2 / 2 | 2 | Comarch Data Center Kraków | ISO 27001 | — |
| Asseco Cloud (Asseco Group) | 2 / 2 | not published | Asseco Cloud Data Center Łódź | ISO 9001:2015, ISO/IEC 27001:2022 | — |
| Talex S.A. | 2 / 2 | not published | Talex Data Center Poznań | EN 50600 (highest class, all categories) | — |
| Data4 | 1 / 1 | 60 | Data4 Warsaw Campus | PCI DSS:2018, Green Circle (Waste Diversion from Landfill) | — |
| Vantage Data Centers | 1 / 0 | 48 | Vantage Warsaw Campus | not published | — |
| Polcom | 1 / 1 | 15 | Polcom Data Center Skawina | ISO 27001:2017, ISO 27017:2015, ISO 9001:2015 | — |
| LIM DC | 1 / 1 | 6 | LIM Data Centers | not published | — |
| TARR Centrum Innowacyjności sp. z o.o. | 1 / 1 | 6 | EXEA Data Center | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, ISO 22301:2012 | — |
| 3S Data Center (Play/P4) | 1 / 1 | 1 | 3S Data Center Gdańsk | not published | — |
| EdgeConneX | 1 / 1 | not published | EdgeConneX Warsaw | not published | — |
| Flowberg IT | 1 / 1 | not published | Flowberg IT Data Center Wrocław | not published | — |
| ICT Future | 1 / 1 | not published | ICT Future Data Center Wrocław | not published | — |
| IQ PL | 1 / 1 | not published | IQ PL Data Center Gdańsk | ISO 27001, ISO 22301, ISO 9001 | — |
| Netia | 1 / 1 | not published | Netia Data Center Mind (Jawczyce) | EN 50600 Class 3 | — |
| OVHcloud | 1 / 1 | not published | OVHcloud Warsaw Data Center | not published | — |
| PCPD (Pomorskie Centrum Przetwarzania Danych) | 1 / 1 | not published | PCPD Data Center Gdańsk | ISO/IEC 27001:2013 | — |
| PNT Euro-Centrum | 1 / 1 | not published | Euro-Centrum Katowice Data Center | Uptime Institute Tier III Certification of Design Documents | — |
| TPnets sp. z o.o. | 1 / 1 | not published | TPnets Red Tower Data Center Łódź | not published | — |
Colocation markets in Poland
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Warsaw | 17 | 154 |
| Colocation in Wrocław | 4 | not published |
| Colocation in Gdańsk | 3 | 1 |
| Colocation in Łódź | 3 | not published |
| Colocation in Poznań | 3 | 44 |
Availability in Poland: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Poland?
By tracked sites: Equinix with 4. By published IT capacity: Data4 with 60 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Poland, including some that do not sell space.
Is there colocation capacity available in Poland right now?
Coloprice tracks 35 facilities here (34 operational, 1 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Poland?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Poland