26 facilities · 15 operators · 111 MW tracked
Colocation in Madrid: pricing, providers and capacity
15 operators run 26 tracked data centers in Madrid (26 operational, 111+ MW published, 0 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
Madrid metro metro market: all facilities, capacity and operators →
How much does colocation cost in Madrid?
15 operators run 26 tracked data centers in Madrid; the largest by sites is Equinix (5). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Madrid publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Madrid
Operators with tracked data centers in Madrid, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Equinix | 5 / 5 | not published | Equinix MD2 | Climate Neutral Data Centre Pact, ISO 14001, ISO 22301 | — |
| Digital Realty | 4 / 4 | not published | MAD1 | ISO 9001, ISO 14001, ISO 22301 | — |
| BBVA | 3 / 3 | not published | BBVA Complejo Tecnologico Tres Cantos - CPD II | Uptime Institute Tier IV Certification of Design Documents Tier IV Certification of Constructed Facility Tier IV Gold Certification of Operational Sustainability, Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability | — |
| Global Switch | 2 / 2 | 70 | Global Switch Madrid 1 | not published | — |
| Templus | 2 / 2 | 5 | Templus MAD02 | ISO, ENS (Alto), Tier III Ready (per operator) | — |
| CyrusOne | 1 / 1 | 18 | CyrusOne MAD1 | not published | — |
| NextStream | 1 / 1 | 10 | Nabiax Julián Camarillo Data Center | All 3 modules designed and built according to Uptime Institute Tier III standards | — |
| ESpanix | 1 / 1 | 8 | ESpanix Datacenter Madrid | not published | — |
| Cogent Communications | 1 / 1 | not published | Cogent Madrid | not published | — |
| IaaS Datacenter Madrid | 1 / 1 | not published | IaaS Datacenter Madrid | not published | — |
| Ibercom | 1 / 1 | not published | Ibercom Madrid | not published | — |
| IPCore Datacenter SL | 1 / 1 | not published | IPCore Datacenter Madrid | not published | — |
| nLighten | 1 / 1 | not published | nLighten Madrid MAD1 | not published | — |
| Telefónica de España S.A.U. | 1 / 1 | not published | Telefónica de España S.A.U. Data Center Beskar CNSO | Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility | — |
| Verizon Communications | 1 / 1 | not published | Verizon Madrid | not published | — |
Availability in Madrid: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Madrid?
By tracked sites: Equinix with 5. By published IT capacity: Global Switch with 70 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Madrid, including some that do not sell space.
Is there colocation capacity available in Madrid right now?
Coloprice tracks 26 facilities here (26 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Madrid?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Madrid
One brief, several operators with capacity in Madrid, Spain, same terms. Independent — no operator pays for position.
Colocation in Madrid? One brief, several quotes.
Request quotes →