5 facilities · 4 operators
Colocation in Uruguay: pricing, providers and markets
4 operators run 5 tracked data centers in Uruguay across 1 cities with at least three sites (5 operational, 0+ MW published, 0 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.
How much does colocation cost in Uruguay?
4 operators run 5 tracked data centers in Uruguay; the largest by sites is Banco de la República Oriental del Uruguay (BROU) (2). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
No published wholesale benchmark for this market. Coloprice does not estimate prices; request quotes below.
Published retail prices
No operator in Uruguay publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Uruguay
Operators with tracked data centers in Uruguay, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| Banco de la República Oriental del Uruguay (BROU) | 2 / 2 | not published | Banco República CPD Casa Central | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier IV Certification of Design Documents | — |
| Antel | 1 / 1 | not published | Data Center Internacional Ing. José Luis Massera | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
| GEOCOM Uruguay S.A. | 1 / 1 | not published | GeoCenter | Uptime Institute Tier III Certification of Design Documents | — |
| Willinn by Zonamerica (MTI S.A.) | 1 / 1 | not published | Zonamerica Datacenter I (Willinn) | Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility | — |
Colocation markets in Uruguay
| City | Sites / live | Published MW |
|---|---|---|
| Colocation in Montevideo | 4 | not published |
Availability in Uruguay: what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Uruguay?
By tracked sites: Banco de la República Oriental del Uruguay (BROU) with 2. By published IT capacity: with 0 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Uruguay, including some that do not sell space.
Is there colocation capacity available in Uruguay right now?
Coloprice tracks 5 facilities here (5 operational, 0 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Uruguay?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Uruguay
One brief, several operators with capacity in Uruguay, same terms. Independent — no operator pays for position.
Colocation in Uruguay? One brief, several quotes.
Request quotes →