Data Center Colocation Costs in Uruguay: Q3 2026 Price Index

Compare 2 data centers in Uruguay across 2 operators: capacity, status, certifications, facilities and colocation pricing context.

2 facilities2 operators

Colocation pricing: Uruguay & other markets — The Colocation Price Index →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.128

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Uruguay· · ·$0.1282
Brazil· · ·$0.12281
Argentina· · ·$0.0921

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Uruguay's catalog holds two Uptime Institute Tier III-certified (Design and Constructed) facilities: state telecom Antel's international-grade data center in the Pando technology park, Canelones, which markets colocation racks and cages alongside cloud and cross-connect services, and Willinn's Zonamerica Datacenter I inside the Zonamerica free-trade business park in Montevideo, self-described as the country's only privately-owned data center certified Tier III at both design and construction stages. Neither operator discloses IT power capacity or floor area for these sites. Business electricity runs $0.128/kWh (GlobalPetrolPrices, Dec 2025), reflecting a grid that state utility UTE keeps close to 100% renewable in most years through wind, hydro, biomass and solar, among the cleanest generation mixes in Latin America. Uruguay's political and regulatory stability, combined with this clean-power profile, position it as a smaller but increasingly cited nearshoring alternative to Argentina and Brazil.

Frequently asked questions

How much does colocation cost in Uruguay?

No published wholesale $/kW benchmark exists for Uruguay yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 2 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Uruguay?

Commercial electricity in Uruguay is $0.128 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 2 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Uruguay?

On power alone, Brazil ($0.122/kWh), Argentina ($0.092/kWh) run below Uruguay. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Uruguay market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Uruguay?

Coloprice tracks 2 data centers in Uruguay: 2 operational, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Data Center Internacional Ing. José Luis MasseraAntelUruguayPandoIII33EOperational
Zonamerica Datacenter I (Willinn)Willinn by Zonamerica (MTI S.A.)UruguayMontevideoIII33EOperational