▮▮Coloprice

Firebird DC-2

Announced

Firebird DC-2 is a data center in Hrazdan, Armenia, operated by Firebird, announced, not yet built.

Announced phase-two expansion of Firebird's Hrazdan campus for 75,000 NVIDIA VR200 GPUs; the operator publishes two different capacity figures for it — 125 MW on one page and 280 MW on another — and no construction milestones.

Firebird DC-2 — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · planned
Operator
Firebird
City
Hrazdan, Armenia
Power, MW
Cooling
Liquid
AI-ready
Yes

Coloprice Score

4 out of 100

limited data · #3 of 3 in Armenia

  • Resilience0/35
  • Compliance0/20
  • Transparency0/20
  • Scale4/15
  • Maturity0/10
How the score is calculated →
Embed score badge
Firebird DC-2 — Coloprice Score 4
<a href="https://coloprice.com/data-centers/armenia/hrazdan/firebird-dc2-hrazdan/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/firebird-dc2-hrazdan.svg"
    alt="Firebird DC-2 — Coloprice Score 4" height="64">
</a>

DC-2 is the announced second building of Firebird's Armenian campus at Hrazdan, listed by the operator as a 75,000-GPU deployment on the NVIDIA VR200 platform. It is included here as an announcement rather than a project with verifiable parameters, because the operator's own published figures do not agree: the company's data-centers page lists DC-2 at 280 MW, while the homepage lists the same expansion at 125 MW, and a separate 'by the numbers' block states 125 MW as capacity per facility at full build. The company's broader roadmap language — more than 70,000 NVIDIA Rubin and Blackwell GPUs and 300 MW in Armenia by the end of 2027 — sits between those numbers and does not resolve them. No site address, substation arrangement, grid connection agreement, construction start or delivery date has been published for DC-2 specifically. A third site, DC-3, is listed on the same roadmap for Kazakhstan, where Firebird says it has secured 125 MW at Data Center Valley with Kazakh government approvals and a US Bureau of Industry and Security export authorization. Anyone underwriting Armenian capacity beyond DC-1 should treat DC-2 as unbuilt and unspecified until the operator publishes a single capacity figure and a grid connection.

  • Announced 75,000-GPU NVIDIA VR200 expansion at the Hrazdan campus
  • Operator publishes conflicting capacity: 280 MW on one page, 125 MW on another
  • No published address, grid connection, construction start or delivery date
  • Part of a stated 300 MW Armenian roadmap for end-2027
  • Companion site DC-3 is planned in Kazakhstan, not Armenia

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Hrazdan

Source — Verified against operator sources · data pending on-site verification