▮▮Coloprice
← All countries

3 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Armenia: Q3 2026 Price Index

Compare 3 data centers in Armenia across 2 operators, 17 MW: capacity, status, certifications, facilities and colocation pricing context.

3 facilities17 MW tracked2 operators

Colocation pricing: Armenia & other markets — The Colocation Price Index → · Best data centers in Armenia →

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.122

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 1 Tier III/IV · 2 AI-ready · 17+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Armenia· · ·$0.1223
Kazakhstan· · ·$0.0869
Ukraine· · ·$0.1855
Moldova· · ·$0.1751

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Armenia is a one-project market. Firebird's DC-1 in Hrazdan — 15 of the country's 17 recorded MW, liquid-cooled, 6,144 NVIDIA B200s, live since August 2026 — is what puts the country in this index at all. A second Firebird site is announced, but the operator states its capacity inconsistently across its own pages, so the catalog records none rather than pick a number. The only other facility is OVIO in Abovyan at 2 MW and 216 racks. Power at $0.122/kWh is mid-range regionally and unusually stable: regulated tariffs have not moved since February 2022, and generation leans on nuclear and hydro rather than gas, which is the basis of Firebird's own power argument. One caution on certification: OVIO markets itself as Armenia's certified Tier III facility, while the Uptime registry records a Design Documents award.

Frequently asked questions

How much does colocation cost in Armenia?

No published wholesale $/kW benchmark exists for Armenia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 3 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Armenia?

Commercial electricity in Armenia is $0.122 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 3 facilities in our catalog, 1 of them announced or under construction.

Where is colocation cheaper near Armenia?

On power alone, Kazakhstan ($0.086/kWh) run below Armenia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Armenia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Armenia?

Coloprice tracks 3 data centers in Armenia: 2 operational with 17 MW of published IT power, 0 under construction and 1 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.

Data centers

FacilityOperatorCountryCityPower, MWTierScoreReviewsStatus
Firebird DC-1FirebirdArmeniaHrazdan1530·Operational
Firebird DC-2FirebirdArmeniaHrazdan4·Announced
OVIO Data Center AbovyanOVIO (GNC-ALFA CJSC)ArmeniaAbovyan (Kotayk Province)2III56COperational