NEXTDC M3 West Footscray
Operational25 Indwe St, West Footscray VIC 3012
NEXTDC M3 West Footscray is a data center in Melbourne (West Footscray), Australia, operated by NEXTDC, with 225 MW of published IT capacity, currently operational.
NEXTDC's largest operational Melbourne facility, a 225 MW data centre in West Footscray that the operator markets as its only "Tier IV" site in Victoria.

- Operator
- NEXTDC
- City
- Melbourne (West Footscray), Australia
- Power, MW
- 225 MW
- Cooling
- Air
- Floor space
- 41,000 m²
Coloprice Score
41 out of 100
Class D · #7 of 62 in Australia
- Resilience0/35
- Compliance14/20
- Transparency9/20
- Scale11/15
- Maturity7/10
Connectivity: 8 networks and 1 internet exchanges are present in this facility. Source: PeeringDB →
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
M3 is NEXTDC's third Melbourne facility, located at 25 Indwe St in West Footscray about 10 km from the CBD. The roughly 41,000 sqm building sits on a wider 100,000 sqm campus and is positioned by the operator as a new digital gateway for Victoria, next to a major electricity substation and core telecommunications infrastructure; the current data centre listing discloses 225 MW of IT capacity, up from the 150 MW target stated when the site launched. NEXTDC markets M3 as its only "Tier IV" facility in Victoria, though this is the operator's own design classification rather than a named third-party certification body. The site holds ISO 27001, ISO 9001, ISO 14001 and ISO 45001 management-system certifications plus a NABERS energy rating, and is designated Certified Strategic and DTA-certified for Australian government workloads. M3 interconnects directly with NEXTDC's existing M1 and M2 Melbourne campuses, giving tenants access to the operator's national ecosystem of 770+ service providers and partners. No year-opened date, rack density or renewable-energy sourcing figures specific to M3 are published on the pages reviewed. It is the largest of NEXTDC's three Melbourne buildings by disclosed power and floor area, with a fourth, M4, in planning nearby.
- ▮225 MW disclosed IT capacity — NEXTDC's largest Melbourne facility (up from a 150 MW launch target)
- ▮NEXTDC's own "Tier IV" design classification — not an independently named certification body
- ▮41,000 sqm building on a 100,000 sqm campus at West Footscray, ~10 km from Melbourne CBD
- ▮Direct interconnection with NEXTDC's M1 and M2 Melbourne campuses
- ▮ISO 27001/9001/14001/45001, NABERS rating; Certified Strategic and DTA certified
Colocation pricing: Australia & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Melbourne (West Footscray)
Source — Verified against operator sources · data pending on-site verification