21 facilities · 12 operators · 2,584 MW tracked
Colocation in Melbourne (Tullamarine): pricing, providers and capacity
12 operators run 21 tracked data centers in Melbourne (Tullamarine) (18 operational, 2,584+ MW published, 3 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.
How much does colocation cost in Melbourne (Tullamarine)?
12 operators run 21 tracked data centers in Melbourne (Tullamarine); the largest by sites is NEXTDC (4). There is no city-level benchmark for Melbourne (Tullamarine); the closest published wholesale figure is Sydney at $188 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.
Wholesale benchmark
$188 /kW·mo
Sydney · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published
Published average; CBRE reports rents stable year over year
Published retail prices
No operator in Melbourne (Tullamarine) publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.
Colocation providers in Melbourne (Tullamarine)
Operators with tracked data centers in Melbourne (Tullamarine), sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.
| Operator | Sites / live | Published MW | Top-scored facility | Certifications | AI-ready |
|---|---|---|---|---|---|
| NEXTDC | 4 / 3 | 511 | NEXTDC M2 Melbourne | Uptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier IV Gold Certification of Operational Sustainability, ISO 9001 | — |
| Equinix | 4 / 4 | not published | Equinix ME2 | ISO 9001, ISO 14001, ISO 22301 | — |
| CDC Data Centres | 2 / 1 | 750 | CDC Brooklyn Campus | not published | 2 |
| AirTrunk | 2 / 2 | 539 | AirTrunk MEL1 Melbourne | Australian Government Certified Strategic, SCEC Zone 3 | — |
| STACK Infrastructure | 2 / 2 | 432 | STACK MEL01 | not published | — |
| GreenSquareDC | 1 / 0 | 240 | GreenSquareDC MEL1 | not published | — |
| Vantage Data Centers | 1 / 1 | 64 | Vantage Melbourne Campus (MEL1) | not published | — |
| Fujitsu | 1 / 1 | 28 | Fujitsu Noble Park Data Centre | not published | — |
| Telstra InfraCo | 1 / 1 | 20 | Telstra InfraCo Clayton Data Centre | ISO 27001, ISO 14001, ISO 9001 | 1 |
| Digital Realty | 1 / 1 | not published | Digital Realty MEL11 | not published | — |
| Interactive | 1 / 1 | not published | Interactive Melbourne Data Centre | ISO 9001, ISO 27001 | — |
| Micron21 | 1 / 1 | not published | Micron21 MEL1 | Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility | — |
Availability in Melbourne (Tullamarine): what the numbers do and do not say
Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.
What the colocation price includes — and what it does not
- Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
- Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
- Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.
See also
Weekly digest: price moves, capacity and deals in one email.
FAQ
Who are the largest colocation providers in Melbourne (Tullamarine)?
By tracked sites: NEXTDC with 4. By published IT capacity: CDC Data Centres with 750 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Melbourne (Tullamarine), including some that do not sell space.
Is there colocation capacity available in Melbourne (Tullamarine) right now?
Coloprice tracks 21 facilities here (18 operational, 3 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.
How do I get comparable colocation quotes in Melbourne (Tullamarine)?
Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Sydney benchmark. The form below routes one brief to matching operators; no operator pays for position.
Get colocation quotes in Melbourne (Tullamarine)