▮▮Coloprice

21 facilities · 12 operators · 2,584 MW tracked

Colocation in Melbourne (Tullamarine): pricing, providers and capacity

12 operators run 21 tracked data centers in Melbourne (Tullamarine) (18 operational, 2,584+ MW published, 3 AI-ready). Below: the published price benchmark for this market, retail list prices where operators publish them, who owns capacity here, and how to get comparable quotes. Catalog data from primary sources; no estimates.

How much does colocation cost in Melbourne (Tullamarine)?

12 operators run 21 tracked data centers in Melbourne (Tullamarine); the largest by sites is NEXTDC (4). There is no city-level benchmark for Melbourne (Tullamarine); the closest published wholesale figure is Sydney at $188 per kW per month (CBRE, Global Data Center Trends 2026 (17 June 2026), H2 2025 – Q2 2026). No operator in this market publishes a retail rate card; prices are quoted on request.

Wholesale benchmark

$188 /kW·mo

Sydney · CBRE, Global Data Center Trends 2026 (17 June 2026) · H2 2025 – Q2 2026 · country-level benchmark, no city figure published

Published average; CBRE reports rents stable year over year

Wholesale $/kW benchmarks by market

Published retail prices

No operator in Melbourne (Tullamarine) publishes a retail rate card on its website. That is normal for wholesale-led markets and says nothing about price level — request quotes with one brief.

Retail rate cards: 1U to full rack

Colocation providers in Melbourne (Tullamarine)

Operators with tracked data centers in Melbourne (Tullamarine), sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
NEXTDC4 / 3511NEXTDC M2 MelbourneUptime Institute Tier IV Certification of Constructed Facility, Uptime Institute Tier IV Gold Certification of Operational Sustainability, ISO 9001—
Equinix4 / 4not publishedEquinix ME2ISO 9001, ISO 14001, ISO 22301—
CDC Data Centres2 / 1750CDC Brooklyn Campusnot published2
AirTrunk2 / 2539AirTrunk MEL1 MelbourneAustralian Government Certified Strategic, SCEC Zone 3—
STACK Infrastructure2 / 2432STACK MEL01not published—
GreenSquareDC1 / 0240GreenSquareDC MEL1not published—
Vantage Data Centers1 / 164Vantage Melbourne Campus (MEL1)not published—
Fujitsu1 / 128Fujitsu Noble Park Data Centrenot published—
Telstra InfraCo1 / 120Telstra InfraCo Clayton Data CentreISO 27001, ISO 14001, ISO 90011
Digital Realty1 / 1not publishedDigital Realty MEL11not published—
Interactive1 / 1not publishedInteractive Melbourne Data CentreISO 9001, ISO 27001—
Micron211 / 1not publishedMicron21 MEL1Uptime Institute Tier IV Certification of Design Documents, Uptime Institute Tier IV Certification of Constructed Facility—

Availability in Melbourne (Tullamarine): what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Melbourne (Tullamarine)?

By tracked sites: NEXTDC with 4. By published IT capacity: CDC Data Centres with 750 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Melbourne (Tullamarine), including some that do not sell space.

Is there colocation capacity available in Melbourne (Tullamarine) right now?

Coloprice tracks 21 facilities here (18 operational, 3 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Melbourne (Tullamarine)?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Sydney benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Melbourne (Tullamarine)

One brief, several operators with capacity in Melbourne (Tullamarine), Australia, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.