Tecto TFOR3 (Mega Lobster)

Operational

Tecto TFOR3 (Mega Lobster) is a data center in Fortaleza, Brazil, operated by Tecto Data Centers, with 20 MW of published IT capacity, currently operational, opened in 2025.

Tecto's third and largest Fortaleza data center, Mega Lobster, opened in October 2025 on Praia do Futuro with 13,000 sqm across ten data halls designed for 1,000 racks and 20 MW, energizing its first phase around 4 MW.

Tecto TFOR3 (Mega Lobster) — schematic illustration
Schematic illustration based on published specifications, not a photograph · air-cooled · in operation

9 of 14 fields published · Operator? Add or correct data →

Units
City
Fortaleza, Brazil
Power, MW
20 MW
Cooling
Air
Opened
2025
Floor space
13,000 m²
Racks
1,000
Market benchmark
$160 per kW per month wholesale · Brazil
Index rate for the market, not this operator’s price list
Address
Av. Dioguinho & R. Francisco Montenegro, Praia do Futuro, Fortaleza, CE, Brazil

3 sources · data pending on-site verification

E

Coloprice Score

34 out of 100

Class E · #36 of 245 in Brazil

  • Resilience0/35
  • Compliance0/20
  • Transparency14/20
  • Scale11/15
  • Maturity9/10
How the score is calculated →
Embed score badge
Tecto TFOR3 (Mega Lobster) — Coloprice Score 34
<a href="https://coloprice.com/data-centers/brazil/fortaleza/tecto-tfor3-mega-lobster-fortaleza/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/tecto-tfor3-mega-lobster-fortaleza.svg"
    alt="Tecto TFOR3 (Mega Lobster) — Coloprice Score 34" height="64">
</a>

Connectivity: 2 networks and 0 internet exchanges are present in this facility.

Awards & badges

Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.

Tecto TFOR3 (Mega Lobster) — Top 3 data centers in Fortaleza, Brazil 2026
#3 of 17 · See the list →

Mega Lobster is Tecto Data Centers' third and largest facility in Fortaleza, built on Praia do Futuro next to the company's original cable landing station and its earlier Big Lobster building. Inaugurated in October 2025 after roughly 12 months of construction, the site covers 13,000 sqm across ten data halls of about 300 sqm each, designed for up to 1,000 racks and 20 MW of total capacity; the first phase energized around 4 MW, with further modules to be activated as contracted demand grows toward the 20 MW design target by December 2029. Tecto describes the facility as carrier-neutral, running on 100% renewable energy with a closed-loop cooling system that avoids continuous water withdrawal. Brazil's development bank BNDES and the Ministry of Communications committed R$233.46 million — about 40% of the R$550 million total project cost — through the Fust telecom-universalization fund and the BNDES Finem credit line, part of parent company V.tal's broader push to expand Brazilian data-center capacity. Fortaleza's dense cluster of transatlantic submarine cables, including the planned Synapse cable to the United States, positions Mega Lobster as an international gateway serving hyperscale, cloud and content-delivery tenants across Latin America.

  • ▮10 data halls of ~300 sqm each, built for 1,000 racks and 20 MW
  • ▮Closed-loop cooling with zero continuous water consumption
  • ▮R$233.46M in BNDES/Fust public financing announced January 2026
  • ▮Third data center on Tecto's integrated Fortaleza cable-landing campus

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

More data centers in Fortaleza

FacilityOperatorPower, MWTierStatus
Tecto TFOR3 (Mega Lobster)Tecto Data Centers20—Operational
Scala SFORPF01 (Praia do Futuro, under construction)Scala Data Centers7.2—Under construction
Scala SFORPF02 (Fortaleza, under construction)Scala Data Centers13.5—Under construction
AngoNAP FortalezaAngola Cables5IIIOperational
Hostweb Data Center FOR 01Hostweb—IIIOperational
Tecto TFOR1 (Fortaleza CLS)Tecto Data Centers——Operational

Source — Verified against operator sources · data pending on-site verification

  • Tecto — TFOR3 (Mega Lobster)
  • TELETIME — Tecto inaugura maior data center de Fortaleza e projeta expansão
  • Movimento Econômico — Mega Lobster recebe R$ 233 mi e amplia maior data center do NE até 2029