▮▮Coloprice

OVHcloud Beauharnois Campus

Operational

Beauharnois, Quebec, Canada

OVHcloud Beauharnois Campus is a data center in Beauharnois, Canada, operated by OVHcloud, currently operational, opened in 2012.

OVHcloud's first data center outside Europe, opened in 2012 inside a former Rio Tinto Alcan aluminium smelter on Quebec's hydroelectric grid.

OVHcloud Beauharnois Campus — schematic illustration
Schematic illustration based on published specifications, not a photograph · liquid-cooled · in operation
Operator
OVHcloud
City
Beauharnois, Canada
Power, MW
—
Cooling
Liquid
Opened
2012
—

Coloprice Score

15 out of 100

limited data · #61 of 95 in Canada

  • Resilience0/35
  • Compliance0/20
  • Transparency4/20
  • Scale2/15
  • Maturity9/10
How the score is calculated →
Embed score badge
OVHcloud Beauharnois Campus — Coloprice Score 15
<a href="https://coloprice.com/data-centers/canada/beauharnois/ovhcloud-beauharnois/?utm_source=score-badge&utm_medium=embed">
  <img src="https://coloprice.com/badge/score/ovhcloud-beauharnois.svg"
    alt="OVHcloud Beauharnois Campus — Coloprice Score 15" height="64">
</a>

OVHcloud opened its Beauharnois campus, southwest of Montreal, in January 2012 inside a converted aluminium smelter previously operated by Rio Tinto Alcan - the company's first data center outside Europe and the anchor for its expansion into North and Latin America. By its 10th anniversary the campus hosted close to 90,000 servers, with the property engineered for roughly three times that number as OVHcloud keeps adding halls; the locations page it publishes lists eight data center buildings on the site. Power comes from Hydro-Quebec's grid, which runs on close to 98% hydroelectric generation, and the campus also houses one of OVHcloud's two server-manufacturing plants, where machines are assembled, repaired and reused to stretch service life to five-to-fifteen years. As at OVHcloud's other campuses, servers are cooled with the company's proprietary water-cooling loops rather than conventional air conditioning. OVHcloud has since expanded its Canadian footprint with a second campus near Toronto, in Cambridge, Ontario, which opened in 2024.

  • ▮OVHcloud's first data center outside Europe, opened January 2012 in a converted aluminium smelter
  • ▮Powered by Hydro-Quebec's grid (close to 98% hydroelectric); campus also hosts one of OVHcloud's two server-manufacturing plants
  • ▮Close to 90,000 servers hosted as of the 10-year-anniversary announcement, with capacity engineered for roughly 3x that
  • ▮Proprietary water-cooling loops replace conventional air conditioning
  • ▮Grown to eight data center buildings on the campus per OVHcloud's own infrastructure count

Get Quotes

Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.

We reply within one business day. No spam, no reselling your contacts.

Customer reviews

No reviews yet

Be the first to review — for current or former customers, work email required.

Write a review

Write a review

For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.

Your ratings
Uptime & reliability
Support & remote hands
Connectivity & cross-connects
Value for money
Onboarding & contract

Review guidelines →

Operate this facility? Get your free "Listed on Coloprice" badge →

Data release:

Source — Verified against operator sources · data pending on-site verification