▮▮Coloprice

163 facilities · 71 operators · 2,499 MW tracked

Colocation in Canada: pricing, providers and markets

71 operators run 163 tracked data centers in Canada across 13 cities with at least three sites (154 operational, 2,499+ MW published, 19 AI-ready). Below: the published price benchmark, retail list prices, the operator list and the city pages. Catalog data from primary sources; no estimates.

How much does colocation cost in Canada?

71 operators run 163 tracked data centers in Canada; the largest by sites is Cologix (23). No published wholesale $/kW benchmark exists for this market yet, so Coloprice shows none rather than an estimate. Published retail list prices in this market start at CAD 45 (1U colocation, Sucura Networks). 2 operators publish rate cards here.

Wholesale benchmark

/kW·mo

Toronto · CBRE, North America Data Center Trends H1 2025 — Market Profiles: Toronto (8 Sep 2025) · H2 2025 – Q2 2026

CBRE H1 2025 Toronto profile: C$210–250/kW/mo for 250–500 kW (C$180–190 for 10 MW+); figures in CAD and from H1 2025, so the USD index row waits for a current release

Wholesale $/kW benchmarks by market

Published retail prices

  • CAD 59 — 1U colocation, Sucura Networks (Toronto (245 Consumers Rd), Montreal; 1A included (+$30/A))
  • CAD 45 — 1U colocation, Sucura Networks (Toronto (245 Consumers Rd), Montreal; )
  • CAD 109 — 1U server colocation, Hive Data Center (Montreal; 200 W @ 240V, A+B plugs)

Retail rate cards: 1U to full rack

Colocation providers in Canada

Operators with tracked data centers in Canada, sorted by sites, then published capacity. Sites / operational; MW is the sum of what each operator publishes for these sites. Some entries are hyperscaler or enterprise sites that do not sell colocation — check the facility card.

OperatorSites / livePublished MWTop-scored facilityCertificationsAI-ready
Cologix23 / 2365Cologix VAN3ISO 27001, HIPAA assessment, SOC 1 Type 2—
eStruxture16 / 15127eStruxture MTL-2PCI DSS, SOC 1 Type II, SOC 2 Type II4
Qu Data Centres10 / 1027Qu Data Centres TOR3SOC 1, SOC 2, CSAE 3416—
Equinix9 / 9not publishedEquinix TR1ISO 22301, ISO 27001, ISO 50001—
Beanfield Metroconnect5 / 5not publishedBeanfield 151 Front Streetnot published—
Bell AI Fabric4 / 1307Bell AI Fabric Saskatchewannot published4
Vantage Data Centers4 / 4177Vantage Quebec City Campus (QC2)Uptime Tier III Certification of Design Documents, Uptime Tier III Certification of Constructed Facility, Uptime Tier III Certification of Design Documents (QC21)—
Digital Realty4 / 4not publishedDigital Realty TOR1not published—
Rogers Communications4 / 4not publishedRogers Communications ODC3Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility, Uptime Institute Tier III Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents—
TELUS4 / 2not publishedTELUS Rimouski Data Centre (Sovereign AI Factory)Tier III certified, LEED Gold certified4
IREN3 / 3160IREN Mackenzie Campusnot published3
Telehouse3 / 338Telehouse 151 Front Street WestISO 27001, SOC 2, PCI DSS—
Hut 83 / 33Hut 8 Kelownanot published—
PureColo3 / 3not publishedPureColo OTT02 (Ottawa DC1)not published—
Rogers Data Centres3 / 3not publishedRogers Calgary DC2 (1313 10th Ave SW)not published—
Csquare2 / 248Csquare YYZ2SOC 1 Type II, SOC 2 Type II, PCI-DSS—
CGI2 / 2not publishedMississauga Data CentreUptime Institute Tier III Certification of Design Documents—
Cogent Communications2 / 2not publishedCogent Torontonot published—
Enovum Datacenters2 / 2not publishedEnovum Datacenters MTL01not published—
EXA Infrastructure2 / 2not publishedEXA Edge DC Halifax Landingstationnot published—
LES.NET (1996)2 / 2not publishedLES.NET YWG2not published—
OVHcloud2 / 2not publishedOVHcloud Toronto Campus (Cambridge, ON)not published—
Root Data Center2 / 2not publishedRoot Data Center MTL-R1not published—
SaskTel2 / 2not publishedSaskTel Saskatoon Data Centre, Phase 1Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility, Uptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility—
Meta Platforms1 / 01,000Meta Sturgeon County AI Campusnot published1
EverWind1 / 0420EverWind Point Tupper Data Centre Campusnot published1
STACK Infrastructure1 / 156STACK TOR01not published1
Compass Datacenters1 / 130Compass Toronto Campusnot published—
Yondr Group1 / 027Yondr Torontonot published—
Serverfarm1 / 114ServerFarm TOR1 Torontonot published1
11:11 Systems1 / 1not published11:11 Systems Mississauga Data CenterISO 20000-1:2018, ISO 27001:2022, SOC 2 Type II—
365 Data Centers1 / 1not published11:11 Systems Carlstadt TOR7not published—
Bell - NHS1 / 1not publishedBell - NHS VSL - Phase3 - DCR10Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Bell Aliant1 / 1not publishedBell Aliant Saint John Data CentreUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Bell Canada1 / 1not publishedBell Canada Ottawa Region Data CentreUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Bell MTS Data Centres G.P.1 / 1not publishedBell MTS Data Centres G.P. - DC01not published—
BMO Financial Group1 / 1not publishedBMO Financial Group Barrie, Ontario Data CenterUptime Institute Tier IV Certification of Constructed Facility—
Canada15Edge Data Centers1 / 1not publishedCanada15Edge Data Centernot published—
Cogeco Data Services1 / 1not publishedCogeco Barrie Data CentreUptime Institute Tier III Certification of Design Documents—
COLO-D inc.1 / 1not publishedCOLO-D1Uptime Institute Tier III Certification of Design Documents—
DataCity1 / 1not publishedDataCity 440 Waterloonot published—
Datahive1 / 1not publishedDatahivenot published—
EdgeConneX1 / 1not publishedEdgeConneX Torontonot published—
Fibre Centre1 / 1not publishedFibre Centrenot published—
Government of Canada1 / 1not publishedGovernment of Canada Enterprise Data Centre BordenUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability—
Hive Data Center1 / 1not publishedHive Data Center - Montrealnot published—
Hydro-Québec1 / 1not publishedHydro-Québec Centre VarennesUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Internetworking Atlantic1 / 1not publishedInternetworking Atlanticnot published—
Kolotek1 / 1not publishedK2 - BouchervilleUptime Institute Tier III Certification of Design Documents—
Leaseweb Canada1 / 1not publishedLeaseweb MTL-01not published—
Loblaw Companies1 / 1not publishedLoblaw Companies 2PCC Data Centre, Phase 1AUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility Tier III Gold Certification of Operational Sustainability—
Lumen Technologies1 / 1not publishedLevel(3) Torontonot published—
Managed Network Systems1 / 1not publishedGoyeau Data Centrenot published—
Manitoba Hydro Telecom1 / 1not publishedManitoba Hydro Telecom Data Centrenot published—
MTS Data Centres1 / 1not publishedDC1 WaverleyUptime Institute Tier III Certification of Design Documents—
Netflash Internet Solutions1 / 1not publishedNetflash Datacentre - Victoria St, Kitchenernot published—
Nuday Networks1 / 1not publishedNuday DC1not published—
OnX Enterprise Solutions1 / 1not publishedOnX Enterprise Solutions Truro DC1, Phase 1Uptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Openface Internet Inc., Colocation Operations Div.1 / 1not publishedOpenface DC2not published—
Pathway Communications & NetPulse Services1 / 1not publishedGreen DatacenterUptime Institute Tier III Certification of Design Documents—
Province of Ontario1 / 1not publishedProvince of Ontario Guelph Data CentreUptime Institute Tier IV Certification of Design Documents Tier IV Certification of Constructed Facility Tier IV Gold Certification of Operational Sustainability—
Saskatchewan Telecommunications1 / 1not publishedSaskTel Saskatoon Northnot published—
Saskatoon Internet Exchange1 / 1not publishedInnovation Place - 121RDnot published—
Smartdc1 / 1not publishedSmartdc Montrealnot published—
Solutions Globales C.D.D. Inc.1 / 1not publishedCentre de Données HQ DrummondUptime Institute Tier III Certification of Design Documents—
Sun Life Financial1 / 1not publishedSun Life Financial Waterloo Data CentreUptime Institute Tier III Certification of Design Documents Tier III Certification of Constructed Facility—
Teranet1 / 1not publishedTeranet Mississauga Data CentreUptime Institute Tier III Certification of Design Documents, Uptime Institute Tier III Certification of Constructed Facility—
The Exchange Group1 / 1not publishedGlobal Server Centernot published—
ThinkOn Data Centres1 / 1not publishedThinkOn Data Centres Cambridgenot published—
VDC Virtual Data1 / 1not publishedVDC BlackSun 2 Reginanot published—
Wolfpaw Data Centres1 / 1not publishedWolfpaw Edmonton 1not published—

Colocation markets in Canada

Availability in Canada: what the numbers do and do not say

Published megawatts describe how facilities are designed, not how much power is available to a new customer today. Vacancy is confirmed only in an operator's proposal for a specific hall and ready-for-service date. Where operators have told Coloprice that a market is sold out to a date, the facility cards say so; otherwise assume nothing and ask each provider the same question.

What the colocation price includes — and what it does not

  • Included in the base fee: rack or cabinet space, a committed power circuit, cooling, physical security, and usually a basic remote-hands allowance.
  • Billed separately: metered electricity above the allowance (or a per-kWh rate on retail contracts), cross-connects, IP transit, additional remote hands, and one-off setup or installation fees.
  • Wholesale contracts add annual escalators, ramp schedules and power-commitment minimums; retail contracts add overage rates and bandwidth caps. Compare providers on the same committed kW, density, term and connectivity.

Weekly digest: price moves, capacity and deals in one email.

FAQ

Who are the largest colocation providers in Canada?

By tracked sites: Cologix with 23. By published IT capacity: Meta Platforms with 1,000 MW. Facility counts and MW come from operator pages and registries; the table above lists every operator with a tracked site in Canada, including some that do not sell space.

Is there colocation capacity available in Canada right now?

Coloprice tracks 163 facilities here (154 operational, 9 under construction or announced) but does not track vacancy. Availability, rack density and delivery dates are confirmed only in a current proposal for a specific hall — send the same brief to several providers and compare.

How do I get comparable colocation quotes in Canada?

Send every provider one brief: committed kW, density per rack, redundancy, carriers and cloud on-ramps, start date, term and expansion rights. Ask for space, power, metered electricity, cross-connects, installation and remote hands as separate lines, then compare against the Toronto benchmark. The form below routes one brief to matching operators; no operator pays for position.

Get colocation quotes in Canada

One brief, several operators with capacity in Canada, same terms. Independent — no operator pays for position.

We reply within one business day. No spam, no reselling your contacts.