163 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Canada: Q3 2026 Price Index
Compare 163 data centers in Canada across 71 operators, 2,494 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Canada & other markets — The Colocation Price Index → · Best data centers in Canada → · Data center companies in Canada · Colocation pricing and providers in Canada →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Qu Data Centres TOR3 | Qu Data Centres | Canada | Markham | 10 | III | SOC 1SOC 2+4 | 53C | Operational |
| Qu Data Centres EDM2 | Qu Data Centres | Canada | Edmonton, AB | 3 | III | ISO 27001SOC 1+7 | 52C | Operational |
| Vantage Quebec City Campus (QC2) | Vantage Data Centers | Canada | Quebec City | 86 | III | — | data pending | Operational |
| Qu Data Centres OTT3 | Qu Data Centres | Canada | Ottawa, ON | 2 | III | ISO 27001SOC 1+6 | data pending | Operational |
| Vantage Montreal I Campus (QC1) | Vantage Data Centers | Canada | Montreal | 11 | III | — | data pending | Operational |
| eStruxture MTL-2 | eStruxture | Canada | Montreal | 30 | — | PCI DSSSOC 1+2 | 44D | Operational |
| eStruxture CAL-2 | eStruxture | Canada | Balzac, AB | 26 | — | PCI DSSSOC 1+2 | 44D | Operational |
| Telehouse 151 Front Street West | Telehouse | Canada | Toronto | 20 | — | ISO 27001SOC 2+1 | 42D | Operational |
| eStruxture MTL-4 | eStruxture | Canada | Kirkland, QC | 16.5 | — | PCI DSSSOC 1+2 | data pending | Operational |
| Province of Ontario Guelph Data Centre | Province of Ontario | Canada | Guelph Ontario | — | IV | — | data pending | Operational |
| Telehouse 250 Front Street West | Telehouse | Canada | Toronto | 10 | — | ISO 27001SOC 2+1 | data pending | Operational |
| Telehouse 905 King Street West | Telehouse | Canada | Toronto | 8 | — | ISO 27001SOC 2+1 | data pending | Operational |
| eStruxture CAL-1 | eStruxture | Canada | Calgary | 9 | — | PCI DSSSOC 1+2 | data pending | Operational |
| Qu Data Centres CGY3 | Qu Data Centres | Canada | Airdrie, AB | — | III | ISO 27001SOC 1+7 | data pending | Operational |
| Equinix TR1 | Equinix | Canada | Toronto | — | — | ISO 22301ISO 27001+5 | 40D | Operational |
| Equinix TR2 | Equinix | Canada | Toronto | — | — | ISO 22301ISO 27001+5 | 40D | Operational |
| Equinix TR4 | Equinix | Canada | Toronto | — | — | ISO 22301ISO 27001+5 | 40D | Operational |
| Equinix TR5 | Equinix | Canada | Markham | — | — | ISO 22301ISO 27001+5 | 40D | Operational |
| Equinix TR6 | Equinix | Canada | Brampton | — | — | ISO 22301ISO 27001+5 | 40D | Operational |
| Equinix TR7 | Equinix | Canada | Brampton | — | — | ISO 22301ISO 27001+5 | 40D | Operational |
| Csquare YYZ2 | Csquare | Canada | Markham | 28.7 | — | SOC 1SOC 2+3 | data pending | Operational |
| Csquare YYZ1 | Csquare | Canada | Mississauga | 19.1 | — | SOC 1SOC 2+3 | data pending | Operational |
| eStruxture MTL-1 | eStruxture | Canada | Montreal | 5 | — | PCI DSSSOC 1+2 | data pending | Operational |
| Qu Data Centres LDN1 | Qu Data Centres | Canada | London, ON | 5 | — | ISO 27001SOC 1+7 | data pending | Operational |
| BMO Financial Group Barrie, Ontario Data Center | BMO Financial Group | Canada | Barrie, ON | — | IV | — | data pending | Operational |
| eStruxture TOR-1 | eStruxture | Canada | Toronto | 10 | — | PCI DSSSOC 1+2 | data pending | Operational |
| eStruxture TOR-4 | eStruxture | Canada | Toronto | 10 | — | PCI DSSSOC 1+3 | data pending | Operational |
| eStruxture TOR-5 | eStruxture | Canada | Barrie, ON | 10 | — | PCI DSSSOC 1+2 | data pending | Operational |
| eStruxture VAN-1 | eStruxture | Canada | Vancouver | 2.4 | — | PCI DSSSOC 1+3 | data pending | Operational |
| Qu Data Centres EDM1 | Qu Data Centres | Canada | Edmonton, AB | 2.5 | — | ISO 27001SOC 1+7 | data pending | Operational |
| Qu Data Centres CGY1 | Qu Data Centres | Canada | Calgary | 2.6 | — | ISO 27001SOC 1+7 | data pending | Operational |
| Qu Data Centres CGY2 | Qu Data Centres | Canada | Calgary | 1.8 | — | ISO 27001SOC 1+7 | data pending | Operational |
| eStruxture MTL-3 | eStruxture | Canada | Boucherville, QC | 1.2 | — | PCI DSSSOC 1+2 | data pending | Operational |
| eStruxture TOR-3 | eStruxture | Canada | Toronto | 5 | — | PCI DSSSOC 1+2 | data pending | Operational |
| eStruxture VAN-2 | eStruxture | Canada | Vancouver | 2.14 | — | PCI DSSSOC 1+2 | data pending | Operational |
| Government of Canada Enterprise Data Centre Borden | Government of Canada | Canada | Ottawa, ON | — | III | — | data pending | Operational |
| Loblaw Companies 2PCC Data Centre, Phase 1A | Loblaw Companies | Canada | Brampton | — | III | — | data pending | Operational |
| Bell - NHS VSL - Phase3 - DCR10 | Bell - NHS | Canada | Ville St-Laurent Quebec | — | III | — | data pending | Operational |
| Bell Aliant Saint John Data Centre | Bell Aliant | Canada | Saint John New Brunswick | — | III | — | data pending | Operational |
| Bell Canada Ottawa Region Data Centre | Bell Canada | Canada | Ottawa, ON | — | III | — | data pending | Operational |
| Hydro-Québec Centre Varennes | Hydro-Québec | Canada | Sainte-Julie | — | III | — | data pending | Operational |
| OnX Enterprise Solutions Truro DC1, Phase 1 | OnX Enterprise Solutions | Canada | Truro Nova Scotia | — | III | — | data pending | Operational |
| Rogers Communications ODC3 | Rogers Communications | Canada | Ottawa, ON | — | III | — | data pending | Operational |
| Rogers Communications EDC2, Phase 2A, Day 1, Part 1 | Rogers Communications | Canada | Edmonton, AB | — | III | — | data pending | Operational |
| Rogers Communications Toronto Data Centre 3 | Rogers Communications | Canada | Markham | — | III | — | data pending | Operational |
| Rogers Communications CDC3 Phase 1 & 2 | Rogers Communications | Canada | Airdrie, AB | — | III | — | data pending | Operational |
| SaskTel Saskatoon Data Centre, Phase 1 | SaskTel | Canada | Saskatoon Saskatchewan | — | III | — | data pending | Operational |
| SaskTel White City Data Centre, Phase 1 | SaskTel | Canada | White City Saskatchewan | — | III | — | data pending | Operational |
| Sun Life Financial Waterloo Data Centre | Sun Life Financial | Canada | Waterloo | — | III | — | data pending | Operational |
| Teranet Mississauga Data Centre | Teranet | Canada | Mississauga | — | III | — | data pending | Operational |
Nothing matches the filters
All 163 facilities, A–Z
- 11:11 Systems Carlstadt TOR7 Mississauga
- 11:11 Systems Mississauga Data Center Mississauga
- Beanfield 151 Front Street Toronto, ON
- Beanfield 23 Fraser Avenue Toronto, ON
- Beanfield 250 Front Street Toronto, ON
- Beanfield 3445 Park Avenue Montreal, QC
- Beanfield 905 King Street Toronto, ON
- Bell - NHS VSL - Phase3 - DCR10 Ville St-Laurent Quebec
- Bell AI Fabric Kamloops 1 Kamloops
- Bell AI Fabric Kamloops 2 (Thompson Rivers University) Kamloops
- Bell AI Fabric Merritt Merritt, BC
- Bell AI Fabric Saskatchewan RM of Sherwood, near Regina, SK
- Bell Aliant Saint John Data Centre Saint John New Brunswick
- Bell Canada Ottawa Region Data Centre Ottawa, ON
- Bell MTS Data Centres G.P. - DC01 Winnipeg, MB
- BMO Financial Group Barrie, Ontario Data Center Barrie, ON
- Canada15Edge Data Center Toronto
- Centre de Données HQ Drummond Drummondville, QC
- Cogeco Barrie Data Centre Barrie, ON
- Cogent Mississauga Mississauga
- Cogent Toronto Toronto
- COLO-D1 Drummondville, QC
- Cologix CGY1 Calgary
- Cologix MTL1 Montreal
- Cologix MTL10 Longueuil, QC
- Cologix MTL11 Montreal
- Cologix MTL12 Montreal (Verdun)
- Cologix MTL2 Montreal (Verdun)
- Cologix MTL3 Montreal
- Cologix MTL4 Montreal
- Cologix MTL5 Montreal
- Cologix MTL6 Montreal
- Cologix MTL7 Montreal
- Cologix MTL8 Montreal
- Cologix MTL9 Drummondville, QC
- Cologix TOR1 Toronto
- Cologix TOR2 Toronto
- Cologix TOR3 Toronto
- Cologix TOR4 Markham, ON
- Cologix TOR5 Markham, ON
- Cologix VAN1 Vancouver
- Cologix VAN2 Vancouver
- Cologix VAN3 Vancouver
- Cologix VAN4 Vancouver
- Cologix VAN5 Vancouver
- Compass Toronto Campus Toronto (Etobicoke)
- Csquare YYZ1 Mississauga
- Csquare YYZ2 Markham
- DataCity 440 Waterloo Waterloo
- Datahive Calgary
- DC1 Waverley Winnipeg, MB
- Dickson Data Center Montreal
- Digital Realty TOR1 Vaughan, ON
- Digital Realty Toronto YYZ11 Toronto
- Digital Realty YYZ10 Markham, ON
- Digital Realty YYZ12 Toronto, ON
- EdgeConneX Toronto Toronto
- Enovum Data Centers - MTL02 pointe-claire
- Enovum Datacenters MTL01 Montreal
- Equinix CL1 Calgary
- Equinix CL3 Calgary
- Equinix MT1 - Montreal Saint-Laurent
- Equinix TR1 Toronto
- Equinix TR2 Toronto
- Equinix TR4 Toronto
- Equinix TR5 Markham
- Equinix TR6 Brampton
- Equinix TR7 Brampton
- eStruxture CAL-1 Calgary
- eStruxture CAL-2 Balzac, AB
- eStruxture CAL-3 Rocky View County, AB
- eStruxture MTL-1 Montreal
- eStruxture MTL-2 Montreal
- eStruxture MTL-3 Boucherville, QC
- eStruxture MTL-4 Kirkland, QC
- eStruxture MTL-5 Montreal
- eStruxture TOR-1 Toronto
- eStruxture TOR-2 Toronto
- eStruxture TOR-3 Toronto
- eStruxture TOR-4 Toronto
- eStruxture TOR-5 Barrie, ON
- eStruxture VAN-1 Vancouver
- eStruxture VAN-2 Vancouver
- eStruxture VAN-3 Burnaby, BC
- EverWind Point Tupper Data Centre Campus Point Tupper
- EXA Datacenter Toronto Toronto
- EXA Edge DC Halifax Landingstation halifax
- Fibre Centre Moncton
- Global Server Center Winnipeg, MB
- Government of Canada Enterprise Data Centre Borden Ottawa, ON
- Goyeau Data Centre Windsor
- Green Datacenter Markham
- Hive Data Center - Montreal Pointe-Claire
- Hut 8 Kelowna Kelowna
- Hut 8 Mississauga Mississauga
- Hut 8 Vaughan Vaughan
- Hydro-Québec Centre Varennes Sainte-Julie
- Innovation Place - 121RD Saskatoon
- Internetworking Atlantic Halifax
- IREN Canal Flats Campus Canal Flats, BC
- IREN Mackenzie Campus Mackenzie, BC
- IREN Prince George Campus Prince George, BC
- K2 - Boucherville Boucherville, QC
- Leaseweb MTL-01 Montreal
- LES.NET YWG2 Winnipeg, MB
- LES.NET YWG4 Winnipeg, MB
- Level(3) Toronto Toronto
- Loblaw Companies 2PCC Data Centre, Phase 1A Brampton
- Manitoba Hydro Telecom Data Centre Winnipeg, MB
- Meta Sturgeon County AI Campus Sturgeon County, Alberta
- Mississauga Data Centre Mississauga
- Netflash Datacentre - Victoria St, Kitchener Kitchener
- Nuday DC1 Markham
- OnX Enterprise Solutions Truro DC1, Phase 1 Truro Nova Scotia
- Openface DC2 Montreal
- OVHcloud Beauharnois Campus Beauharnois
- OVHcloud Toronto Campus (Cambridge, ON) Cambridge, Ontario
- Province of Ontario Guelph Data Centre Guelph Ontario
- PureColo OTT02 (Ottawa DC1) Ottawa, ON
- PureColo STJ01 (Saint John) Saint John
- PureColo VAN01 (Vancouver) Vancouver
- Qu Data Centres CGY1 Calgary
- Qu Data Centres CGY2 Calgary
- Qu Data Centres CGY3 Airdrie, AB
- Qu Data Centres EDM1 Edmonton, AB
- Qu Data Centres EDM2 Edmonton, AB
- Qu Data Centres LDN1 London, ON
- Qu Data Centres OTT2 Ottawa, ON
- Qu Data Centres OTT3 Ottawa, ON
- Qu Data Centres TOR3 Markham
- Qu Data Centres Toronto Toronto
- Rogers Calgary DC1 (Franklin Atrium) Calgary
- Rogers Calgary DC2 (1313 10th Ave SW) Calgary
- Rogers Calgary DC3 (Airdrie) Calgary
- Rogers Communications CDC3 Phase 1 & 2 Airdrie, AB
- Rogers Communications EDC2, Phase 2A, Day 1, Part 1 Edmonton, AB
- Rogers Communications ODC3 Ottawa, ON
- Rogers Communications Toronto Data Centre 3 Markham
- Root Data Center MTL-R1 Montreal
- Root Data Center MTL-R2 Baie-D'Urfe
- SaskTel Saskatoon Data Centre, Phase 1 Saskatoon Saskatchewan
- SaskTel Saskatoon North saskatoon
- SaskTel White City Data Centre, Phase 1 White City Saskatchewan
- ServerFarm TOR1 Toronto Toronto
- Smartdc Montreal Montreal
- STACK TOR01 Toronto
- Sun Life Financial Waterloo Data Centre Waterloo
- Telehouse 151 Front Street West Toronto
- Telehouse 250 Front Street West Toronto
- Telehouse 905 King Street West Toronto
- TELUS 150 West Georgia AI Data Centre Vancouver (Downtown)
- TELUS Kamloops Data Centre (AI Factory) Kamloops
- TELUS M3 AI Data Centre (Mount Pleasant, Vancouver) Vancouver (Mount Pleasant)
- TELUS Rimouski Data Centre (Sovereign AI Factory) Rimouski
- Teranet Mississauga Data Centre Mississauga
- ThinkOn Data Centres Cambridge Toronto
- Vantage Montreal I Campus (QC1) Montreal
- Vantage Montreal II Campus (QC4) Montreal
- Vantage Montreal III Campus (QC6) Montreal
- Vantage Quebec City Campus (QC2) Quebec City
- VDC BlackSun 2 Regina Regina
- Wolfpaw Edmonton 1 Edmonton, AB
- Yondr Toronto Toronto
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.115
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · CBRE, North America Data Center Trends H1 2025 — Market Profiles: Toronto (8 Sep 2025) · 32 Tier III/IV · 19 AI-ready · 2,494+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Canada | · · · | $0.115 | 163 | — |
| United States | $196 | $0.117 | 1332 | — |
| United Kingdom | $213 | $0.454 | 196 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Canada enters the catalog through Equinix's Toronto metro cluster: six operational IBX facilities in downtown Toronto, Markham and Brampton, none with a published power capacity in MW. TR2, at 45 Parliament Street, is by far the largest at 10,124 sqm; TR5 in Markham is the smallest at 833 sqm but runs 2N power and UPS redundancy, a tier above the N+1 disclosed at most siblings. TR1 and TR2 predate Equinix's 2020 acquisition of 13 Bell Canada data centers, which brought the other four sites into the portfolio at once — a single-deal history visible in near-identical certification blocks across every page. Power at $0.115/kWh sits mid-pack against this catalog's other markets, but the headline rate understates the real driver: Ontario's grid is roughly 90% nuclear and hydro, and large industrial users are billed wholesale plus the volatile Global Adjustment surcharge, whose partial relief for big loads is due to start phasing out in 2026.
Frequently asked questions
How much does colocation cost in Canada?
No published wholesale $/kW benchmark exists for Canada yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 163 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Canada?
Commercial electricity in Canada is $0.115 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 163 facilities in our catalog, 9 of them announced or under construction.
Where is colocation cheaper near Canada?
Canada sits at the cheaper end of its regional cluster on the inputs we can verify. The table below compares neighbouring hubs on power tariff, facility count and round-trip time.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Canada market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Canada?
Coloprice tracks 163 data centers in Canada: 154 operational with 747 MW of published IT power, 6 under construction and 3 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →