Equinix TR1
Operational151 Front Street West, 3rd, 5th, 6th & 7th Floors, Toronto, ON M5J 2N1
Equinix TR1 is a data center in Toronto, Canada, operated by Equinix, currently operational.
Equinix's original Toronto IBX, operated by the company since 2010, occupying four floors of a 9-story building at 151 Front Street West in the city's core telecom hub.

- Operator
- Equinix
- City
- Toronto, Canada
- Power, MW
- —
- Cooling
- Air
- Floor space
- 3,352 m²
Coloprice Score
40 out of 100
Class D · #6 of 40 in Canada
- Resilience10/35
- Compliance18/20
- Transparency5/20
- Scale0/15
- Maturity7/10
Connectivity: 45 networks and 5 internet exchanges are present in this facility. Source: PeeringDB →
Awards & badges
Earned from the rankings — position in the country, city, category and worldwide lists, plus score axes at their maximum. Free to embed on the operator's site; each badge links back to the list that certifies it.
Equinix TR1 occupies the 3rd, 5th, 6th and 7th floors of a 9-story steel-frame building at 151 Front Street West in downtown Toronto — a well-known regional carrier-hotel address. Per Equinix's own October 2020 announcement of its Bell Canada data center acquisition, the company "has operated" TR1 since 2010, making it, alongside TR2, one of the two Toronto facilities Equinix ran before that deal added four more sites (TR4, TR5, TR6, TR7) to the metro. The current facility page lists 36,081 sq ft (3,352 sqm) of colocation space, N+1 power and UPS redundancy, N+1 cooling redundancy, generator autonomy of 30 hours or more at full load, and a minimum cabinet density of 2 kVA on 120V/208V distribution — the lowest published density in the Toronto metro. Certifications named are ISO 22301, ISO 27001, ISO 50001, ISO 9001, PCI DSS, SOC 1 Type II and SOC 2 Type II; Equinix also states 99.9999%+ global uptime as its own SLA claim rather than a third-party certification. Total power capacity in MW, rack count and the building's original construction year are not published.
- ▮Operated by Equinix since 2010, per the operator's own 2020 acquisition announcement
- ▮36,081 sq ft (3,352 sqm) across four floors of a 9-story building at 151 Front St West
- ▮N+1 power/UPS/cooling redundancy, 30+ hr generator autonomy
- ▮Minimum cabinet density 2 kVA — lowest disclosed in the Toronto metro
Colocation pricing: Canada & other markets — The Colocation Price Index →
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Customer reviews
No reviews yet
Be the first to review — for current or former customers, work email required.
Write a review
For current or former customers of this facility. We verify the work email and publish only your role and company — never the email. Text is edited for spelling only.
Operate this facility? Get your free "Listed on Coloprice" badge →
Data release:
More data centers in Toronto
Source — Verified against operator sources · data pending on-site verification