4 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data centers in Nicosia: 4 facilities, colocation pricing
Colocation pricing and providers in Nicosia →
How many data centers are in Nicosia?
Coloprice tracks 4 data centers in Nicosia, Cyprus: 3 operational, 1 under construction and 0 announced, run by 4 operators.
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.308
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 2 Tier III/IV · 0 AI-ready · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Nicosia, Cyprus | · · · | $0.308 | 4 | — |
| Greece | · · · | $0.221 | 21 | — |
| Israel | · · · | $0.117 | 25 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Frequently asked questions
How many data centers are in Nicosia?
Coloprice tracks 4 data centers in Nicosia, Cyprus: 3 operational, 1 under construction and 0 announced, run by 4 operators.
Which operators run data centers in Nicosia?
By number of facilities tracked: MTN Cyprus LTD (1), RedMax Technologies Ltd. (1), Cyta (1), PrimeTel (1).
How much does colocation cost in Nicosia, Cyprus?
No published wholesale $/kW benchmark exists for Nicosia, Cyprus yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 4 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Nicosia, Cyprus?
Commercial electricity in Nicosia, Cyprus is $0.308 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 4 facilities in our catalog, 1 of them announced or under construction.
Where is colocation cheaper near Nicosia, Cyprus?
On power alone, Greece ($0.221/kWh), Israel ($0.117/kWh) run below Nicosia, Cyprus. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Nicosia, Cyprus market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Data centers
| Facility | Operator | Power, MW | Tier | Status |
|---|---|---|---|---|
| MTN LATSIA Datacenter | MTN Cyprus LTD | — | III | Operational |
| RedOne Datacenter | RedMax Technologies Ltd. | — | — | Under construction |
| Cyta Data Center Nicosia | Cyta | — | III* | Operational |
| PrimeTel Nicosia Data Centre | PrimeTel | — | — | Operational |
Get Quotes
Tell us what you need — we match you with data centers in our catalog and return real quotes. Free for buyers.
Nearby data center markets
Colocation quotes in Nicosia: free, reply within one business day
Get Quotes →