8 facilities · Q3 2026 · H2 2025 – Q2 2026 ·
Data Center Colocation Costs in Estonia: Q3 2026 Price Index
Compare 8 data centers in Estonia across 7 operators, 22 MW: capacity, status, certifications, facilities and colocation pricing context.
Colocation pricing: Estonia & other markets — The Colocation Price Index → · Best data centers in Estonia → · Data center companies in Estonia · Colocation pricing and providers in Estonia →
Data centers
→ Browse by certification: ISO 27001, SOC 2, PCI DSS, Tier III…
| Facility | Operator | Country | City | Certs | ⓘ | Status | ||
|---|---|---|---|---|---|---|---|---|
| Greenergy Data Centers | Greenergy Data Centers | Estonia | Harku (Tallinn area) | 18 | — | ISO 27001PCI DSS | 40D | Operational |
| CITIC Telecom CPC DataHOUSE@Tallinn | CITIC Telecom CPC | Estonia | Tallinn | — | — | ISO 27001ISO 9001+3 | data pending | Operational |
| Infonet DC | Infonet DC OÜ | Estonia | Tallinn | 4 | — | — | data pending | Operational |
| Elisa Eesti Data Center | Elisa | Estonia | Tallinn | — | — | ISO 9001ISO 14001+3 | data pending | Operational |
| Server Farm | Server Farm OÜ | Estonia | Viimsi | — | — | — | data pending | Operational |
| Telia Telehouse KJJ | Telia Company | Estonia | Tallinn | — | — | — | data pending | Operational |
| WaveCom DC | Aktsiaselts WaveCom | Estonia | Tallinn | — | — | — | data pending | Operational |
| Telia Telehouse MUS | Telia Company | Estonia | Tallinn | — | — | — | data pending | Operational |
Nothing matches the filters
All 8 facilities, A–Z
- CITIC Telecom CPC DataHOUSE@Tallinn Tallinn
- Elisa Eesti Data Center Tallinn
- Greenergy Data Centers Harku (Tallinn area)
- Infonet DC Tallinn
- Server Farm Viimsi
- Telia Telehouse KJJ Tallinn
- Telia Telehouse MUS Tallinn
- WaveCom DC Tallinn
· · ·
Average wholesale, $/kW/mo — Collecting
· · ·
Retail rack, $/mo — Collecting
· · ·
Year on year
$0.167
Commercial power, $/kWh
Q3 2026 · · H2 2025 – Q2 2026 · 1 AI-ready · 22+ MW · sources
How this market compares
| Market | $/kW/mo | $/kWh | facilities | Round-trip |
|---|---|---|---|---|
| Estonia | · · · | $0.167 | 8 | — |
| Latvia | · · · | $0.178 | 19 | — |
| Finland | · · · | $0.105 | 31 | — |
| Germany | $250 | $0.269 | 274 | — |
Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index
Why prices sit where they do
Estonia's colocation market is the thinnest of the three Baltic states — three recorded facilities, none holding an Uptime Institute Tier certificate of any kind, confirmed by a direct search of Uptime's own public registry. Greenergy Data Centers, built on a former MCF Group site in Hüüru near Tallinn, leads by far: 18 MW of contracted power with a stated path past 300 MW for hyperscale and AI tenants, though its Tier language stops at 'EN 50600-aligned' design rather than certification. Infonet DC, an older Tallinn site, self-describes as 'Tier 3' on the same uncertified basis. CITIC Telecom CPC's smaller DataHOUSE@Tallinn facility is explicit that its design basis is Tier II, not III. At $0.167/kWh, Estonia has the cheapest business power of the three Baltic states, though every Tier claim in the market currently rests on operators' own word rather than independent certification.
Frequently asked questions
How much does colocation cost in Estonia?
No published wholesale $/kW benchmark exists for Estonia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 8 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.
Why is colocation priced the way it is in Estonia?
Commercial electricity in Estonia is $0.167 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 8 facilities in our catalog, 0 of them announced or under construction.
Where is colocation cheaper near Estonia?
On power alone, Finland ($0.105/kWh) run below Estonia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.
Download this market (CSV)
Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.
Full Estonia market report
Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.
Quick answer
How many data centers are in Estonia?
Coloprice tracks 8 data centers in Estonia: 8 operational with 22 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.
Compare colocation quotes from vetted operators: free, reply within one business day
Get Quotes →