▮▮Coloprice
← All countries

19 facilities · Q3 2026 · H2 2025 – Q2 2026 ·

Data Center Colocation Costs in Latvia: Q3 2026 Price Index

Compare 19 data centers in Latvia across 11 operators, 13 MW: capacity, status, certifications, facilities and colocation pricing context.

19 facilities13 MW tracked11 operators

Colocation pricing: Latvia & other markets — The Colocation Price Index → · Best data centers in Latvia → · Data center companies in Latvia · Colocation pricing and providers in Latvia →

Data centers

FacilityOperatorCountryCityCerts ⓘStatus
Delska EU North Riga LV DC1DelskaLatviaRiga10IIILEEDISO 27001+367BOperational
Tet Dattum Data CenterTetLatviaRiga—IIIPCI DSSISO 27001data pendingOperational
Tet DC7TetLatviaSalaspils—III—38DOperational
Lattelecom Dattum Data CenterLattelecomLatviaRiga—III—data pendingOperational
Tet Kleistu Data CenterTetLatviaRiga——PCI DSSISO 27001data pendingOperational
Tet Brīvības Data CenterTetLatviaRiga——PCI DSSISO 27001data pendingOperational
Tet Atlasa Data CenterTetLatviaRiga——PCI DSSISO 27001data pendingOperational
Tet DC6TetLatviaRiga——PCI DSSISO 27001data pendingOperational
Tet Pērses Data Center (ODC)TetLatviaRiga——PCI DSSISO 27001data pendingOperational
Delska EU North Riga LV DC2DelskaLatviaRiga2—Built in acc…data pendingOperational
Delska EU North Riga LV DC3DelskaLatviaRiga1—Built in acc…data pendingOperational
VERnet DCVERSIJA Ltd.LatviaRiga———data pendingOperational
LVRTC Datu CentrsLVRTCLatviaRiga——Built to EN …data pendingOperational
CloudHosting Data CenterCloudHosting SIALatviaRiga———data pendingOperational
Baltcom Data CenterBaltcomLatviaRiga——ISO 9001data pendingOperational
Perses 2 - RigaSanta Monica NetworksLatviaRiga———data pendingOperational
Sigmanet Data CentreLUMIILatviaRiga———data pendingOperational
RETN AD DCRETNLatviaRiga———data pendingOperational
Bite One IT Data CenterBite LatvijaLatviaRiga———data pendingOperational
All 19 facilities, A–Z

· · ·

Average wholesale, $/kW/mo — Collecting

· · ·

Retail rack, $/mo — Collecting

· · ·

Year on year

$0.178

Commercial power, $/kWh

Q3 2026 · · H2 2025 – Q2 2026 · 4 Tier III/IV · 2 AI-ready · 13+ MW · sources

How this market compares

Market$/kW/mo$/kWhfacilitiesRound-trip
Latvia· · ·$0.17819—
Lithuania· · ·$0.20017—
Estonia· · ·$0.1678—
Germany$250$0.269274—

Round-trip times are measured figures from the latency matrix; power tariffs from the index. Cross-connects add $50–$350 per month each on top of any rate. Round-trip · The Index

Why prices sit where they do

Latvia's record centers on Riga, with one exception in nearby Salaspils, and splits between two groups holding real Uptime Institute Tier III certificates — Delska (three buildings, led by its 10 MW, AI/HPC-oriented flagship DC1) and the majority state-owned Tet, whose Dattum and newly opened DC7 sites make it the only Latvian operator with two separately Tier III Constructed Facility-certified buildings. Five smaller Tet sites and a handful of independent operators (LVRTC, VERnet, CloudHosting, Baltcom, Bite) round out a fifteen-facility market, though most disclose neither power nor floor space. DC7's waste heat now feeds Salaspils' district-heating network, echoing a pattern seen across the Nordics. At $0.178/kWh, Latvia's business electricity price sits below Lithuania's and Germany's, but above Estonia's, its lowest-cost Baltic neighbor. Riga is the only Baltic capital with more than one independently certified Tier III facility.

Frequently asked questions

How much does colocation cost in Latvia?

No published wholesale $/kW benchmark exists for Latvia yet, so we show nothing rather than an estimate. What is verifiable: the catalog tracks 19 facilities here. Run at least three quotes in parallel — where no benchmark is published, individual offers vary far more.

Why is colocation priced the way it is in Latvia?

Commercial electricity in Latvia is $0.178 per kWh, and power is the largest single input into a colocation rate. On top of that sit land and grid-connection availability, interconnection density, and how much capacity competes for the same tenants — 19 facilities in our catalog, 0 of them announced or under construction.

Where is colocation cheaper near Latvia?

On power alone, Estonia ($0.167/kWh) run below Latvia. Whether that becomes a cheaper contract depends on how much interconnection the workload needs — the comparison table shows what latency the move would cost.

Download this market (CSV)

Every facility on this page with power, status, cooling and certifications. Free, CC BY 4.0 — cite Coloprice.

CSV

Full Latvia market report

Operator-level pricing indications, capacity coming online, and the questions worth asking each provider in this market. We compile it per request and send it as PDF.

We reply within one business day. No spam, no reselling your contacts.

Fitting out a facility? Racks, PDUs, containment and cooling sourced factory-direct from China — The Dream View Co., the team behind Coloprice.

Quick answer

How many data centers are in Latvia?

Coloprice tracks 19 data centers in Latvia: 19 operational with 13 MW of published IT power, 0 under construction and 0 announced. The count covers publicly disclosed facilities and grows as operators publish new sites; every figure links to its primary source.